Free sample paper for GB740 Unit 10
Where the Margin Went: A Unit 10 Organizational Development Report for a Civil Engineering Firm
[Student Name]
Purdue University Global
GB740: Organizational Development
Unit 10 Development Report
[Instructor Name]
[Date]
Tallis Engineering, its people and every figure are composite and illustrative; the models and sources cited are real.
Executive Summary
At Tallis Engineering, projects closed in 2025 lost a median of 5.8 points of margin between proposal and completion. This report argues that the loss sits mostly on jobs that borrow staff from other offices, whose median fade of 8.9 points was close to three times the single-office figure, and that the cause is a misfit between work that now crosses office lines and a formal organization that still rewards each office separately. Four changes to the formal organization are proposed: shared margin credit, a resourcing forum with binding authority, a lower project manager utilization target with coordination priced into proposals and a project manager council. They will be introduced to the offices in three waves set by lottery, which allows the effect on fade to be measured against offices still waiting. Success means a reduction of at least two points in median multi-office fade within a year of each office's start.
Entry and Contracting
The project began with two framings. The chief executive saw a skills gap among project managers and had announced a training academy. The chief operating officer, who became the sponsor, asked why margins fade. The contract, built on the distinction Block (2011) draws between what each party wants and what each offers, gave the candidate access to records for 212 closed projects, a firmwide survey, forty interviews, observation of staffing calls and a biweekly hour with the sponsor. Three matters were left open in writing: how findings touching the acquired principals' earnouts would be handled, how disagreements between candidate and sponsor would be resolved and who would tell the chief executive if the academy was not supported. All three later arose.
Diagnosis
The congruence model of Nadler and Tushman (1980) was chosen over Burke-Litwin and Weisbord's six boxes because it explained why the problem appeared after the firm's two acquisitions and because its central prediction could be tested against project records before any interview. The records confirmed it. Eighty-seven of the closed projects used staff from two or more offices, and the difference in fade held across fee bands, client types and projects with and without large change orders.
Three further findings explained the mechanism. Project managers on multi-office projects reported about 14 unbilled coordination hours a week, against about 5 on single-office work, because the 82 percent utilization target penalized coordination. Staff loans between offices were settled as favors in five of six observed staffing calls, with no written procedure. And eight of ten office leaders described lending staff as a cost to their own results, which the bonus plan, based on office profit, confirmed. A fourth finding, higher role ambiguity in acquired offices, was supported by the survey alone.
What Feedback Changed
The diagnostic findings went first to staff in twelve office sessions, then to office leaders and last to the executive team, following the principle set out by Nadler (1977) that people who supply data should work with it before others interpret it. The sessions changed two findings, and the report records both.
The favor economy was reframed. The original reading of the staffing calls described office leaders as hoarding staff. In four sessions, technical staff and project managers objected. They described favors as a working system of reciprocity that had kept multi-office projects staffed for years in the absence of any formal process, and they warned that replacing it carelessly could make staffing worse. The finding was softened: the problem is not that leaders refuse to lend, but that lending depends on relationships, so offices without them, mostly the acquired ones, wait longer. The resourcing forum was redesigned to let offices settle requests between themselves first and to escalate only unresolved ones.
A new cause appeared. In two of the three acquired water offices, project accountants pointed out that hours are still entered under the practice's pre-acquisition job numbers, which are mapped to Tallis projects only at month end. Monthly estimates of margin at completion on projects involving those offices were therefore based on incomplete hours, and fade appeared late and suddenly when the mapping caught up. This explained part of the higher fade on multi-office projects involving the water group, and it was a cause the diagnosis had not looked for. Migrating those offices to the firm's codes was added to the plan as a precondition for their wave.
Two findings changed because the people who supplied the data read it first, which is the strongest argument this report can offer for the order in which feedback was given.
Intervention
The four interventions respond to the four findings, as Unit 7 set out. Three of them change the formal organization, and only the council is a human process intervention. The academy remains, reduced to a single module that teaches coordination budgeting.
Stakeholder Costs
The stakeholder analysis priced each group's losses and changed the proposal twice. Senior engineers in scarce specialties would have been overloaded, so assignments to other offices are capped at 40 percent of their hours without their agreement. Acquired principals' earnouts depend on office profit through 2027, so a parallel ledger calculates their profit both ways and pays on the higher figure, at a cost of no more than $90,000 a year. Office leaders at the four largest offices would lose between $6,000 and $14,000 in bonus, partly offset by a new component for requests filled through the forum.
Evaluation
The evaluation uses the rollout as a stepped design, in which offices still waiting serve as comparisons at each step (Hussey & Hughes, 2007). Its main measure is how far a multi-office project's margin has slipped by its sixth month, read against two years of history. Secondary measures track the mechanism: hours worked across offices, days to fill requests, turnover, role ambiguity and unfilled requests by specialty. The plan states that twelve offices can detect only a large effect and names four rival explanations: attention, contamination between offices, market change and the timing of the acquired offices' wave.
Reflexivity
The candidate spent eleven years at the water practice before Tallis acquired it and remains, in the firm's language, legacy. Coghlan and Brannick (2014) describe the risk that an insider's preunderstanding shapes what they see, and the record suggests it did once. The candidate's first reading of the staffing calls, as hoarding by headquarters offices, matched a view the candidate had held before the project began, and it was staff in the feedback sessions, not the candidate's own review, that corrected it. The accounting codes finding cuts the other way: it located part of the problem in the candidate's own former firm, and the candidate had not suspected it. A faculty adviser reviewed interpretations throughout, as agreed at contracting.
What Remains Uncertain
Everything here comes from a single round of interviews and records for two years of closed work. Whether the changes cut fade will not be clear for about eighteen months. The history Walton (1975) recounts is a reminder that changes which succeed early can revert when attention moves, which is why each intervention has been written into the bonus plan, the budget or the human resources system rather than left to the sponsor's commitment.
References
Block, P. (2011). Flawless consulting: A guide to getting your expertise used (3rd ed.). Pfeiffer.
Coghlan, D., & Brannick, T. (2014). Doing action research in your own organization (4th ed.). SAGE.
Hussey, M. A., & Hughes, J. P. (2007). Design and analysis of stepped wedge cluster randomized trials. Contemporary Clinical Trials, 28(2), 182-191. https://doi.org/10.1016/j.cct.2006.05.007
Nadler, D. A. (1977). Feedback and organization development: Using data-based methods. Addison-Wesley.
Nadler, D. A., & Tushman, M. L. (1980). A model for diagnosing organizational behavior. Organizational Dynamics, 9(2), 35-51. https://doi.org/10.1016/0090-2616(80)90039-X
Walton, R. E. (1975). The diffusion of new work structures: Explaining why success didn't take. Organizational Dynamics, 3(3), 3-22. https://doi.org/10.1016/0090-2616(75)90027-3
What the GB740 Unit 10 assignment asks for
The final GB740 assignment asks you to present the term's organizational development work as one report. Lead with a summary of a page or two giving the claim, the interventions and how they will be judged. After it, each stage of the work, from entry through evaluation, should serve as support for that claim instead of as a chronicle. Condense earlier units and keep their figures consistent. Report any findings that feedback changed, and explain how the design responded. Include a reflexivity section that connects your position to specific decisions and findings. State what remains uncertain, including outcomes not yet known. Write for a sponsor or committee who will read the summary first. Around thirty pages with appendices for instruments, the matrix and the schedule is a common scope.
How the GB 740 Unit 10 example is put together
The executive summary gives the fade figures, the four changes, the lottery rollout and the two-point threshold. Entry recalls the two executive framings and Block's wants and offers. Diagnosis explains the choice of the congruence model and the findings on coordination hours, favors and office leaders' view of lending. The feedback section reports the two changed findings in detail, and the highlighted sentence argues that they justify the order of feedback. Intervention and stakeholder costs are condensed into two short sections. Evaluation cites Hussey and Hughes. The reflexivity section, drawing on Coghlan and Brannick, shows the insider view misleading once and failing to anticipate a second finding, and Walton closes the report.
Where the points sit in the GB740 Unit 10 rubric
The GB740 development report is graded as an argument. Instructors look for a claim stated early and supported by each section, and a report that reads as a timeline loses marks. The executive summary is weighted heavily because sponsors read it first. Consistency of figures across sections is checked closely. A finding that feedback overturned scores well when the report shows it plainly and explains what the design did about it. The reflexivity section is judged on whether it ties the candidate's position to particular decisions. Honest statements about what is not yet known are expected, especially when outcomes lie in the future. Appendices should hold the detail so the body can make the case. Sources from earlier units should appear where they shaped a decision.
Common GB740 Unit 10 mistakes, and how to avoid them
The most common GB740 Unit 10 problem is a report that strings earlier units together, each with its own introduction, so no single claim emerges. Executive summaries often describe the project's history instead of its conclusions. Figures drift between sections as units are pasted in. Findings that changed during feedback are quietly replaced, which hides the strongest evidence of a sound process. Reflexivity sections discuss bias in general rather than naming where the candidate's view shaped a finding. Outcomes not yet measured are sometimes implied. State your claim first, use each stage as evidence, keep figures consistent, report what changed, tie reflexivity to decisions and say what remains unknown. If your units are finished, we can assemble them into one report.
Get a GB740 Unit 10 example written to your instructions
Assemble what your earlier GB740 units produced, whatever state it is in, and note any findings that later work challenged. Add the Unit 10 prompt and rubric. A custom development report built around one defensible argument, with earlier material condensed and revised, is drafted in 24-48h at no cost for a first request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More GB740 papers and MBA samples
- GB740 Unit 1: Discussion Board Post
- GB740 Unit 2: Diagnostic Model Comparison
- GB740 Unit 3: Entry and Contracting Memo
- GB740 Unit 4: Organizational Assessment Plan
- GB740 Unit 5: Data Feedback Report
- GB740 Unit 6: Seminar Reflection
- GB740 Unit 7: Intervention Proposal
- GB740 Unit 8: Stakeholder Cost Analysis
- GB740 Unit 9: Change Evaluation Plan
- GB730 Unit 10: Methodology Chapter Draft
- GB720 Unit 10: Policy Research Paper
- GB710 Unit 10: Scholarly Position Paper
- GB701 Unit 10: Results Section Draft
GB740 Unit 10 questions, answered
Can the Unit 10 report reuse text from earlier units?
Sections vary, and some permit reuse with revision. Even where allowed, pasted sections tend to read as a portfolio rather than a report, because each was written for a different question. Condensing earlier work around the report's central claim, and updating findings that later units changed, is what the synthesis criterion usually rewards.
What if the intervention has not been implemented?
That is the normal situation at term's end. The report presents the design, the evaluation plan and any early indicators, and it states plainly that outcomes are not yet known. Doctoral readers penalize claims of success without data far more than they penalize an honest account of a change still in progress.
How long should the reflexivity section be?
Typically two to four pages in a report of this length. It should connect the candidate's position to particular decisions and findings rather than discussing bias in general. A candidate who shows where their position shaped an interpretation, and how they checked it, demonstrates the judgment the section is meant to assess.
Where can I find a free GB740 Unit 10 sample paper?
A complete GB740 Unit 10 development report is on this page, presenting entry, diagnosis, feedback, intervention, stakeholder costs and evaluation at a civil engineering firm as one argument.
Should findings changed during feedback be reported?
Yes. Reporting what participants corrected shows that feedback did its work, and it explains why later parts of the design differ from what the first diagnosis suggested.