| Course | MT209 Small Business Management |
|---|---|
| Unit | Unit 4 |
| Paper type | Operations review |
| Length | About 1,140 words, 7 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | BS in Business Administration |
| Updated | October 2026 |
Free sample paper for MT209 Unit 4
Eleven Days for Three and a Half Hours of Printing: A Unit 4 Operations Review of a Screen Printing Shop
[Student Name]
Purdue University Global
MT209: Small Business Management
Unit 4 Operations Review
[Instructor Name]
[Date]
Northfork Print and Stitch, the order, its customer and every figure are composite and illustrative; bracketed figures stand where the shop's records would supply the numbers; the sources cited are real.
Why Follow One Order
The owner believes the shop's limit is the automatic press, because the press is visibly full in September. Following one order from start to finish tests that belief with evidence. Womack and Jones (2003) recommended mapping the value stream of a single product family, recording every step from order to delivery and separating the steps that add value from those where the product simply waits. A team shirt order is a good choice because it is the shop's most common fall job, and because school orders arrive with a fixed deadline, a game or a meet, so any delay matters to the customer.
The Order
On a Tuesday in mid-September, a middle school cross-country coach emailed asking for 144 shirts in two colors with the school logo on the front and the season's meet schedule on the back, needed for the conference meet in three weeks. I followed the order through the shop's email, the order board and conversations with the owner and the senior press operator.
The Process Map
The order passed through nine steps. For each, I recorded working time, the minutes someone actually spent on it, and waiting time, the days it sat before the next step began.
Inquiry to quote took two working days. The owner read the email on Tuesday but wrote the quote at her kitchen table on Wednesday night, as she does with most quotes in the fall. Working time was about thirty minutes.
Quote to approved artwork took three working days. The coach approved the price on Thursday but wanted the logo larger and a different font for the meet schedule. Three rounds of emailed proofs followed, each answered by the coach after practice, usually the next day. Working time on the art was about ninety minutes in total.
Blank garment order to delivery took a day and a half. The owner ordered the shirts on Monday morning from the regional warehouse, and they arrived Tuesday afternoon.
Screen preparation took one afternoon, about three hours of an operator's time, including coating, exposing and taping two screens for the front and one for the back.
The order then waited two working days for a gap in the press schedule, because larger high school orders were ahead of it.
Printing and curing took about three and a half hours on the automatic press, including setup, two color passes on the front and one on the back.
Folding, counting by size and bagging took about an hour. The order waited half a day for the owner to write the invoice, and the coach picked it up the next afternoon.
What the Map Shows
Of eleven working days, the press and curing accounted for under half a day. The largest waits came before production began: two days for a quote and three days for art approval. Together those five days were spent waiting for the owner's desk or the customer's reply, not for any machine. The two-day wait for the press was real, but smaller than the delays before it.
Hopp and Spearman (2008) explained that in any production system, the time a job spends waiting in queues usually far exceeds the time it spends being processed, and that reducing queues often matters more than speeding up machines. The cross-country order is a small example of that principle.
The press took three and a half hours; the owner's desk and the coach's inbox took five days.
Capacity Through the Year
The automatic press runs at about [90] percent of available hours in September and under [40] percent in February, according to the shop's job log. That confirms the owner's view that the press is busy in the fall. Goldratt and Cox (2004) built their theory of constraints on the idea that one bottleneck caps the whole operation, so an hour saved anywhere else changes nothing at the end of the day. If the press were the only constraint in September, orders would move quickly through quoting and art and then pile up at the press. Instead, they pile up before the press, at the owner's desk.
The press still matters. In the last two weeks of September, it became the constraint as well, with orders waiting up to four days. But for most of the fall, the desk constrains the shop first.
The Owner's Week
The interview in Unit 3 suggested that quoting happens late at night. Tracking one week in September confirmed it. The owner spent about [18] hours on quotes, art proofs and approval emails, most of it after the shop closed. She also spent about twelve hours on the press floor covering for an operator. Every hour on the press was an hour not spent turning around quotes, which is why quotes took two days.
The week also showed how interruptions add up. Customers walking in to pick up orders, coaches calling with size changes and suppliers confirming deliveries broke her day into pieces of ten or fifteen minutes. Quoting a team order needs a block of half an hour with the garment catalog and the art file open, and the shop day rarely offered one. That is why the quotes moved to the evening, and why they arrived a day later than customers expected.
Findings
Three findings follow. First, most of the elapsed time on a typical order is waiting, and most of that waiting happens before production. Second, the owner's desk is the shop's main constraint for most of the fall, with the press becoming a second constraint only at the very peak. Third, the shop does not track how long quotes take or how many are lost, so the cost of slow quoting is invisible.
Recommendations
The shop should first protect the owner's time for quoting during the day, by not scheduling her on the press except in an emergency. It should build quote templates for its five most common team orders, which would cut quoting time on most jobs to about ten minutes. It should limit art changes to two rounds before an order is scheduled, and ask coaches to approve proofs by a set time. And it should begin a simple log of quotes sent and won, so the next review can measure what slow quotes cost. Unit 6 will examine whether hiring someone to handle quotes and approvals would relieve the constraint more than another press operator.
References
Goldratt, E. M., & Cox, J. (2004). The goal: A process of ongoing improvement (3rd rev. ed.). North River Press.
Hopp, W. J., & Spearman, M. L. (2008). Factory physics (3rd ed.). McGraw-Hill.
Womack, J. P., & Jones, D. T. (2003). Lean thinking: Banish waste and create wealth in your corporation (Rev. ed.). Free Press.
Reading the MT 209 Unit 4 instructions
Unit 4 typically asks for a review of how work moves through the business you adopted, with a recommendation for improvement. Most prompts expect you to map a process, measure time or capacity at each step, identify the constraint and recommend changes aimed at it. Following one real order from start to finish is often the simplest and most convincing method, especially when you record both the time someone worked on it and the time it sat waiting. Combine that with records or the owner's estimates for a typical month, labeling which is which. Capacity across the year matters in seasonal businesses. Recommendations should address the step that actually limits output, which may not be a machine. Expect about five pages, usually with a process map in your own version, and cite operations sources in APA 7.
How this MT209 Unit 4 example is built
The review explains why one order was chosen, citing Womack and Jones on mapping a single product family, and notes that school orders have fixed deadlines. Each of the nine steps is described with its working and waiting time, from a two-day quote to half a day waiting for an invoice, and a margin note explains why the two kinds of time are recorded separately. The findings section shows that waiting before production dwarfs the press time, with Hopp and Spearman on queues. The highlighted line contrasts three and a half hours of printing with five days at the desk and in the coach's inbox. The capacity section uses the job log and Goldratt and Cox to show the press becomes a second constraint only at the peak. A week of the owner's time, broken by interruptions, explains the night quoting. Three findings and four recommendations close it.
Where the points sit in the MT209 Unit 4 rubric
Operations reviews are generally scored on method, measurement and the fit of the recommendations. Tracing one order with working and waiting time at each step demonstrates a sound method and produces evidence a grader can check. Identifying the constraint correctly is central, and graders reward reviews that test the owner's assumption rather than accept it. A capacity view across the year shows awareness of seasonality. Using a theory, such as the theory of constraints, to explain the finding rather than to decorate it earns more credit. Recommendations should target the constraint found; buying equipment when the bottleneck is the office would contradict the analysis. Naming what the business does not measure, and proposing a simple measure, shows practical judgment. Womack and Jones, Hopp and Spearman and Goldratt and Cox need complete APA 7 entries.
MT209 Unit 4 help: mistakes that cost points
Operations reviews commonly go wrong by describing the process in general without measuring anything. Another frequent issue is recording only working time, which hides the waiting where most delay sits. Some writers accept that the busiest machine is the constraint because it looks busy. Others recommend new equipment or more staff without showing that either would shorten the time customers wait. Process maps with no times attached are decorations. Be careful not to treat one order as proof of a pattern; combine it with records or estimates for a typical period and say which is which. If your business is a service, the same method works with appointments, files or jobs in place of shirts. Share the business and an order you can trace, and our writers can help map the steps, separate working from waiting time and target the constraint.
Get an MT209 Unit 4 example written to your instructions
Describe how an order or job moves through the business you adopted this term, even roughly, and attach the MT209 Unit 4 instructions and rubric. The review maps those steps, measures working against waiting time, locates the true constraint and costs each change in owner hours. The first custom sample is free and returns within 24-48h. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More MT209 papers and BS in Business Administration samples
- MT209 Unit 1: Discussion Board Post
- MT209 Unit 2: Business Profile
- MT209 Unit 3: Owner Interview Summary
- MT209 Unit 5: Cash Flow Projection
- MT209 Unit 6: Hiring Plan
- MT209 Unit 7: Supplier Evaluation
- MT209 Unit 8: Growth Analysis
- MT209 Unit 9: Seminar Reflection
- MT209 Unit 10: Consulting Report
- MT207 Unit 4: Competitor Analysis
- MT203 Unit 4: Selection Method Comparison
- MT202 Unit 4: Sales Call Plan
- MT140 Unit 4: Organizational Structure Exercise
MT209 Unit 4 questions, answered
How do I get timing data for a small business?
Tracing one order is often the simplest route: ask when each step started and ended, check emails or order slips for dates, and observe what you can. The sample combines one traced order with the owner's rough estimates for a typical month, labeling which is which. Precision to the hour matters less than showing where the days actually go.
Does an operations review have to recommend new equipment?
No, and in many cases it should not. The sample's traced order showed the press was busy for a few hours of an eleven-day job, so buying another would have addressed the wrong constraint. Recommendations follow from where the waiting sits. In this shop that is the owner's desk, so the changes are procedural and cost far less than a machine.
What if the business I adopted is a service rather than a manufacturer?
The method holds. A salon, an accounting practice or a landscaping firm still moves work through steps with working and waiting time, and the owner often sits at the slowest one. The sample's print shop happens to make things, but its bottleneck is scheduling and approval, which exists in nearly every small service business as well.
Where can I find a free MT209 Unit 4 sample paper?
This page contains a complete MT209 Unit 4 operations review that traces a 144-shirt order through a print shop. It records working and waiting time at nine steps, identifies the constraint, recommends four changes and includes margin notes.
Why is the owner's desk the constraint instead of the press?
Because the order spent five of its eleven days waiting for a quote and art approvals before printing could start. The press was busy in September, but most delay happened upstream at the owner's desk.