MT437 Unit 8 Cycle Count Plan Example

Reviewed by Chester Goodwin, MBA Strategic Warehouse Management Purdue University Global Free custom sample in 24 to 48h

A cycle count plan for a composite Chattanooga distribution center's 31,200 active auto parts is built in this MT437 Unit 8 assignment from ABC classes, count frequencies, daily volume, tolerances and a counting window. By annual dollar movement, 2,500 A parts, about 8 percent of the range, carry about 64 percent of value; 6,860 B parts about 26 percent; and 21,840 C parts the remaining 10. Counting A parts monthly, B quarterly and C twice a year comes to 101,120 counts, about 397 on each of 255 counting days, plus about 60 trigger counts. At 45 locations an hour, the plan needs about 10.2 counter hours daily, a little over one and a third people. Tolerances run from exact for A parts to 5 percent for C. DeHoratius and Raman on record inaccuracy frame it. Purdue Global MT 437 assigns this plan in the BS in Business Administration.

CourseMT437 Strategic Warehouse Management
UnitUnit 8
Paper typeCycle count plan
LengthAbout 870 words, 6 pages double-spaced
FormatAPA 7 student paper
SchoolPurdue University Global
ProgramBS in Business Administration
UpdatedOctober 2026

Free sample paper for MT437 Unit 8

1

About 397 Counts a Day: An MT437 Unit 8 Cycle Count Plan for 31,200 Active Parts

[Student Name]

Purdue University Global

MT437: Strategic Warehouse Management

Unit 8 Cycle Count Plan

[Instructor Name]

[Date]

Lookout Parts Supply, its parts and their annual dollar movement are composite; counting rates and tolerances are stated assumptions, and the sources cited are real.

What this part is doingShowing that the arithmetic closes in the lead tells the grader the plan's workload follows from its frequencies.
2

Why Cycle Counting

Today, Lookout Parts Supply shuts the building for two days each January for a full physical inventory, and in between, the system's quantities drift from what is on the shelves. Unit 7 found pickers spending 11 percent of direct time searching and scanning, much of it at locations whose stock did not match the system. DeHoratius and Raman (2008) found that inventory records at a large retailer were wrong for about 65 percent of items, often because of errors that accumulate quietly between counts. Cycle counting replaces the annual shutdown with a steady schedule that finds and fixes errors while they are small.

ABC Classes

Parts are classed by annual dollar movement, units shipped times cost, because errors in high-movement parts cost the most. About 2,500 A parts, 8 percent of the range, carry about 64 percent of annual dollar movement. About 6,860 B parts, 22 percent, carry about 26 percent. About 21,840 C parts, 70 percent, carry the remaining 10 percent.

Count Frequencies and Workload

A parts are counted monthly, twelve times a year, 30,000 counts. B parts are counted quarterly, 27,440 counts. C parts are counted twice a year, 43,680 counts. The total is 101,120 scheduled counts a year. Over 255 counting days, that is about 397 counts a day.

Trigger counts are added whenever the system shows a location at zero, a quantity goes negative or a picker reports a location short. Based on last quarter's exceptions, these add about 60 counts a day.

At about 45 locations an hour, including travel and recording, about 457 counts a day need about 10.2 counter hours, a little over one and a third people on a 7.5-hour shift. The plan staffs one full-time counter and a second counter for about three hours a day, drawn from the receiving team freed by the Unit 3 two-track process.

Counting every A part every month costs about two and a half counter hours a day; skipping it costs searches every night.

What this part is doingTying the cost of counting A parts to the searching recorded earlier shows why the frequencies are set as they are.
3

Tolerances and Accuracy Targets

A count is accurate if it falls within the tolerance for its class. A parts have no tolerance: the count must match exactly, because they move fastest and are worth the most. B parts are accurate if within one unit or 2 percent of the system quantity, whichever is larger. C parts are accurate within 5 percent.

The accuracy targets are 99.5 percent of A counts, 98 percent of B counts and 95 percent of C counts, measured monthly.

The Counting Process

Counts are blind: the counter sees the location and part but not the system quantity, so the count cannot be anchored to what the system expects. Any count outside tolerance triggers an immediate recount by a second counter. If the recount confirms the difference, the inventory control lead investigates the last transactions at that location, a missed putaway, a mis-pick or an unrecorded transfer, before adjusting the system. Adjustments over $500 on an A part need the inventory manager's approval. Richards (2018) stresses that the value of cycle counting comes from finding why records are wrong, not only from correcting them.

The Counting Window

Counts run on the day shift, between the end of night picking and the afternoon putaway wave, when the night pickers have gone and the forward zones are quiet except for rush orders. Locations being replenished or put away are skipped and rescheduled the next day, because counting a location while stock is moving creates false variances.

What the Plan Will Cost and Save

The plan needs about 10.2 counter hours a day, about 2,600 hours a year, roughly $62,700 at $24.10 an hour, most of it from receivers freed by the Unit 3 change rather than new hires. Against that, the January physical inventory takes the whole building for two days, about 1,100 labor hours plus lost shipping, and the nightly searching recorded in Unit 7 costs far more over a year. The plan is not free, but it replaces costs the company already pays.

Ending the Annual Shutdown

If the plan meets its accuracy targets for twelve months, the company's auditors can be asked to accept cycle counts in place of the January physical inventory, saving two days of closed operations a year. Frazelle (2016) notes that a well-run cycle count program is usually more accurate than an annual count, because errors are found within weeks rather than months.

What Could Go Wrong

Cycle counting fails when counts are skipped on busy days and never made up. The plan therefore tracks counts completed against counts scheduled each week, and any shortfall is carried into the next week rather than dropped.

Recommendation

Start cycle counting with A parts in the first month, add B and C parts in the second, report accuracy by class monthly and review the class boundaries every six months as movement changes.

What this part is doingPhasing the start by class shows the plan can begin without disrupting operations.
4

References

DeHoratius, N., & Raman, A. (2008). Inventory record inaccuracy: An empirical analysis. Management Science, 54(4), 627-641. https://doi.org/10.1287/mnsc.1070.0789

Frazelle, E. H. (2016). World-class warehousing and material handling (2nd ed.). McGraw-Hill Education.

Richards, G. (2018). Warehouse management: A complete guide to improving efficiency and minimizing costs in the modern warehouse (3rd ed.). Kogan Page.

The Purdue Global MT437 Unit 8 instructions

The eighth unit asks students to design a cycle counting program to keep inventory records accurate. Instructors expect parts classed, usually by annual dollar movement, with class sizes and value shares stated. Each class needs a count frequency, and frequencies times class sizes must give an annual and daily workload that closes. Trigger counts for exceptions, such as zero or negative balances, should be added. The workload should be converted into counter hours and staffing. Tolerances and accuracy targets should be set by class, and the counting process should specify blind counts, recounts, investigation and approval of adjustments. A counting window that avoids active stock movement and a plan for replacing the annual physical inventory complete it.

Inside the MT437 Unit 8 example

The plan begins by explaining why cycle counting, citing DeHoratius and Raman and the searching found in Unit 7. ABC classes are defined with sizes and value shares. Frequencies are applied, and the annual total, daily load and trigger counts are computed and converted into staffing, under a highlighted line on the cost of counting A parts. Tolerances and accuracy targets are set by class. The counting process covers blind counts, recounts and investigation, with Richards on finding why records are wrong. The counting window is set to avoid moving stock. A section weighs the plan's cost against the annual shutdown, and another covers skipped counts. Ending the shutdown cites Frazelle.

MT437 Unit 8 rubric: what earns full points

Cycle count plans in MT437 are judged on whether the arithmetic closes. Frequencies by class multiplied by class sizes must equal the annual total, and the daily load must follow from the counting days. Rubrics reward class definitions based on dollar movement with stated shares. Credit goes to adding trigger counts and converting workload into staffing. Tolerances and accuracy targets by class show a plan that can be measured. A process with blind counts, recounts and investigation of causes earns depth marks. A counting window that avoids moving stock shows practicality. Classification and tolerance tables, plus a workload calculation a grader can rework, support the plan.

MT437 Unit 8 help: mistakes that cost points

The most common weak cycle count plan states that A items will be counted more often than C items without computing how many counts that means. Another frequent error sets frequencies whose total cannot be done by the staff available. Students often omit trigger counts, though exceptions are where errors surface. Tolerances are usually missing or the same for every class. Counting while stock is being put away creates false variances that many plans never address. Before submitting, multiply each class size by its frequency, add the totals and divide by counting days. If the daily figure does not match the staffing in your plan, one of the two needs to change.

Get an MT437 Unit 8 example written to your instructions

Share the item data or ABC details from the Unit 8 case file, the operating hours if given, and the rubric. The composite plan written for you classifies parts on a stated basis, checks the daily arithmetic against staff and time, and sets tolerances and recount rules. First custom sample is free; turnaround is 24-48h. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.

More MT437 papers and BS in Business Administration samples

MT437 Unit 8 questions, answered

Should ABC classes use value or pick frequency?

Either can be defended, and many plans use value with a frequency override. Value focuses counting where errors cost most money; frequency focuses it where errors happen most often, since every pick is a chance to take the wrong quantity. State the basis you chose and why, and consider promoting fast-moving cheap items so they are not counted only once or twice a year.

How many counts per day is realistic?

It depends on location type and counting method. Small-parts shelving counted with a handheld scanner often runs at 40 to 60 locations an hour, while pallet rack needing a lift is slower. Use your case's rate if one is given. Then check that daily counts divided by that rate fit the hours and people you have assigned.

What is a control group in cycle counting?

It is a small, fixed set of locations counted repeatedly over a short period, usually daily. Because the same locations are counted again and again, any error that appears can be traced to a recent transaction and its cause identified quickly. It is a diagnostic tool used at the start of a program, not a permanent part of the schedule.

Where can I find a free MT437 Unit 8 sample paper?

You can read the full MT437 Unit 8 plan here, classing 31,200 auto parts by dollar movement and setting counts, tolerances and staffing.

How many counts a day does the MT437 Unit 8 sample plan need?

About 397 scheduled counts plus about 60 trigger counts, roughly 10.2 counter hours at 45 locations an hour.