A ninety-minute scope-cut meeting at a game studio six weeks behind its milestone is planned block by block in this MT340 Unit 9 facilitation plan. Four leads each want to protect their own features, so criteria, player-facing loss, crash risk, days saved and narrative dependency, are agreed before any option is named. One-page cases circulate 48 hours ahead, a restating round has each lead summarize another's case until its owner accepts it, options are drafted silently on cards and then scored. The facilitator is the operations manager, since the producer owns the schedule, and the decision rule, a consultative call by the creative director before the meeting ends, is announced in advance following Vroom. Kaner's diamond explains the sequence and Fisher and colleagues back criteria first. Purdue Global MT 340 asks BS in Business Administration students to design a meeting that ends in a decision. Likely breakdowns are planned for.

CourseMT340 Conflict Management and Team Dynamics
UnitUnit 9
Paper typeMeeting facilitation plan
LengthAbout 880 words, 6 pages double-spaced
FormatAPA 7 student paper
SchoolPurdue University Global
ProgramBS in Business Administration
UpdatedOctober 2026

Free sample paper for MT340 Unit 9

1

Criteria Before Options, the Rule Before the Room: An MT340 Unit 9 Facilitation Plan for a Game Studio's Scope-Cut Meeting

[Student Name]

Purdue University Global

MT340: Conflict Management and Team Dynamics

Unit 9 Facilitation Plan

[Instructor Name]

[Date]

The studio, people and features are composite; the frameworks and research cited are real.

What this part is doingNaming the order of criteria, options and rule in the lead shows the plan's logic before its detail.
2

The Situation

The studio is about six weeks behind on content for its milestone. The leads of design, engineering, art and narrative each have features they believe are essential. Previous attempts to cut scope ended in arguments, with each lead defending their own work and the producer, who owns the schedule, caught in the middle. The meeting must end with a decision.

Facilitator

The studio's operations manager will facilitate. The producer cannot, because the schedule is the producer's and the producer is therefore a party. The operations manager knows the studio's processes, has no feature to defend and is trusted by all four leads.

Decision Rule, Announced in Advance

The decision will be a consultative call by the creative director, made before the meeting ends, after hearing every lead and seeing the scored options. Vroom (2000) described consultative decisions as appropriate when a leader needs others' information and input but time does not allow full consensus. The rule will be stated in the meeting invitation and again at the start, so no one expects a vote and no one can later say the process was unclear.

Preparation

Forty-eight hours before the meeting, each lead circulates a one-page case: which features they would cut, which they would protect and why, with estimated days saved for each. The facilitator collects them and sends all four to everyone.

The Agenda

Block one, ten minutes: purpose and rule. The facilitator states the goal, about thirty working days saved, and the decision rule.

Block two, fifteen minutes: criteria. Before any feature is mentioned, the group agrees how options will be judged. The facilitator proposes four criteria and the group may adjust them: player-facing loss, how much players would notice; crash risk, whether the cut removes code likely to cause bugs; days saved; and narrative dependency, whether other content depends on the feature. Criteria agreed now cannot be changed later in the meeting.

Block three, twenty minutes: four cases. Each lead presents their one-page case in five minutes. Only clarifying questions are allowed.

Block four, fifteen minutes: restating round. Each lead summarizes another lead's case, and the case's owner says whether the summary is accurate. The round continues until each owner accepts the summary.

Block five, ten minutes: silent options. Each person writes options on cards without discussion, one combination of cuts per card, that would save about thirty days.

Block six, fifteen minutes: scoring. Options are posted and scored against the four criteria. Discussion is allowed here, but only about scores.

Block seven, five minutes: decision. The creative director chooses an option and explains it against the criteria.

Why This Order

Kaner (2014) describes participatory decision-making as a diamond: groups first open up to diverse views, then pass through an uncomfortable middle period he calls the groan zone, where differences are hard to integrate, and finally converge on a decision. Most meetings skip the opening and try to converge at once, which in this studio has produced arguments rather than decisions. This agenda builds the diamond in: blocks three to five open it, block six is the groan zone and block seven converges.

Agreeing criteria first matters most. Fisher et al. (2011) recommend agreeing on objective criteria before positions harden. If the leads agree what makes a good cut before they see which of their features are at risk, the criteria cannot be bent to protect anyone's work.

If the leads agree what makes a good cut before they see whose features are on the list, nobody can argue the criteria were chosen against them.

What this part is doingExplaining why criteria must come first shows the plan understood how earlier meetings had failed.
3

The Restating Round

The restating round slows the meeting down at the point where earlier meetings sped up. Hearing their own case summarized by a rival lets each lead know they were understood, and having to summarize a rival's case forces each lead to listen. A lead who cannot summarize another's case accurately has not yet heard it.

Silent Options

Writing options silently prevents the loudest voice from setting the frame. It also lets leads propose cuts to their own features without having to say so aloud first, which some may find easier.

Parking Lot

Anything personal, such as complaints about past cuts or about another lead's behavior, goes on a parking lot sheet. The facilitator promises to raise each item with the right person after the meeting, and does.

What Could Go Wrong

A lead may reject the criteria. The facilitator will allow changes in block two only, and will remind the group that criteria are agreed before options precisely to protect everyone. A lead may refuse to accept a summary in block four. The facilitator will ask the summarizer to try once more, then move on with the owner's correction recorded. The creative director may want more time. The rule says the decision is made before the meeting ends; if no option reaches thirty days, the creative director chooses the closest and names what remains to be cut by Friday.

What this part is doingPlanning for each likely breakdown shows the plan was tested against the studio's history.
4

References

Fisher, R., Ury, W., & Patton, B. (2011). Getting to yes: Negotiating agreement without giving in (3rd ed.). Penguin.

Kaner, S. (2014). Facilitator's guide to participatory decision-making (3rd ed.). Jossey-Bass.

Vroom, V. H. (2000). Leadership and the decision-making process. Organizational Dynamics, 28(4), 82-94. https://doi.org/10.1016/S0090-2616(00)00003-6

What the MT340 Unit 9 assignment asks for

Unit 9 asks for a plan to facilitate a meeting where conflict is expected. The plan should state the situation and the decision the meeting must reach. Instructors expect the facilitator and the decision rule to be chosen and justified before the agenda, since both shape everything else. The agenda should be timed, block by block, with the reasoning for each block given beside it. Research on group decision-making, such as Kaner's diamond, should explain the sequence. Preparation before the meeting, ways to handle personal grievances and plans for likely breakdowns are usually expected. The plan should be specific enough for someone else to run the meeting from it, which is a useful test of its clarity.

How the MT 340 Unit 9 example is put together

The sample describes the six-week gap and the four leads. It justifies the operations manager as facilitator and announces the decision rule, citing Vroom. Preparation requires one-page cases 48 hours ahead. Seven timed blocks follow in prose, from purpose and rule through criteria, cases, restating, silent options and scoring to the decision. Kaner's diamond explains the sequence, and Fisher and colleagues support criteria first, under the highlighted line that agreeing what makes a good cut before seeing the list protects everyone. Sections explain the restating round, silent options and the parking lot. A final section plans for rejected criteria, refused summaries and a creative director who wants more time.

Reading the MT340 Unit 9 grading rubric

Facilitation plans are generally judged on the logic of sequence, the justification of facilitator and decision rule, the specificity of the agenda and preparation for breakdowns. Graders reward plans that settle the decision rule before the meeting and announce it. Criteria agreed before options show understanding of how positions harden. Each block should have a reason connected to research or to the group's history. Techniques such as restating and silent drafting should be explained, not just named. Plans for likely breakdowns show realism. A parking lot for personal issues keeps the meeting on its task. Facilitation and decision research appear in APA 7. Plans that list agenda topics without times, roles or a rule tend to receive lower marks.

MT340 Unit 9 help: mistakes that cost points

Facilitation plans often list topics to discuss without saying how the meeting will reach a decision or who will make it. Another common weakness is choosing a facilitator who is a party to the conflict. Some plans move straight to options, which invites each person to defend their own. Breakdowns are rarely anticipated. Before drafting, write down how the last meeting on this topic failed, minute by minute if you can. Then design each block to prevent one of those failures. A plan built against a real history of failure is more convincing than one built from a template.

Get an MT340 Unit 9 example written to your instructions

Outline the meeting you need to plan: who attends, what they disagree about, who has authority to decide and how long the room is booked. Attach the Unit 9 prompt and its rubric. A custom facilitation plan with a timed agenda and a stated decision rule reaches you in 24-48h, and the first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.

More MT340 papers and BS in Business Administration samples

MT340 Unit 9 questions, answered

Which facilitation model fits the Unit 9 plan?

Sections vary, and some leave the choice open. Kaner's diamond of participatory decision-making and Schwarz's skilled facilitator approach are common because both explain why a meeting is sequenced as it is. Nominal group technique suits plans that must gather ideas quietly first. The model matters less than applying it to each block of the agenda.

Should the manager facilitate their own team's meeting?

Often not, when the manager holds a view on the outcome. A plan can name a neutral facilitator from elsewhere in the organization, or have the manager facilitate while declaring the decision rule openly. Either choice should be explained, since readers check whether the person running the meeting also stands to win or lose by it.

How detailed should the agenda be?

Timed blocks with a purpose for each are standard. Minute-by-minute scripts are unusual, except for the opening of the most difficult item, where exact wording can matter. A rationale beside each block, explaining its placement and duration, is where the plan shows understanding rather than scheduling skill.

Where can I find a free MT340 Unit 9 sample paper?

The complete MT340 Unit 9 facilitation plan is on this page, running a game studio's scope-cut meeting in seven timed blocks.

Why are criteria agreed first in the MT340 Unit 9 sample?

So leads agree what makes a good cut before they see which of their own features are at risk, which stops criteria being bent to protect anyone.