| Course | LI410 Leadership in Practice |
|---|---|
| Unit | Unit 9 |
| Paper type | Feedback and coaching plan |
| Length | About 1,530 words, 8 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | BS in Business Administration |
| Updated | October 2026 |
Free sample paper for LI410 Unit 9
The Operator Who Taught Me the Baler: A Unit 9 Feedback and Coaching Plan
[Student Name]
Purdue University Global
LI410: Leadership in Practice
Unit 9 Feedback and Coaching Plan
[Instructor Name]
[Date]
Kettle Run Recovery, the baler operator, the buyer and every figure are composite and illustrative; the models and sources cited are real.
Why This Conversation Keeps Slipping
The person this plan is about is the senior baler operator on my shift, whom I will call Royce. He has run balers at Kettle Run for [seventeen] years. Four years ago, when I moved off the sort line, he taught me to run the baler: how to read the bunker, when to cycle, how to tie off a bale so the wires hold on the truck. Eight months ago we both applied for the second-shift supervisor position, and I got it.
Since then I have noticed a problem with his bales and said nothing about it. I can name three reasons. First, he trained me, and correcting the person who taught you a machine feels like claiming to know it better. Second, he applied for my job, and I worry that any correction will read as a new supervisor proving a point. Third, he is the most respected person on the floor, and the drivers and the mill's receiving clerk all ask for him by name. Each reason has given me an excuse to wait another week. Writing them down is the first step of this plan, because a plan that leaves them unspoken is the kind I would abandon on the walk to the baler.
The Evidence
Our paperboard mill pays by the ton but our freight is charged by the load, so light bales mean more trucks for the same tonnage. The mill's contract asks for mixed-paper bales of at least [1,000] pounds. Over the last [eight] weeks, the scale log shows that [X] percent of Royce's bales fell under that weight, against [Y] percent for the first-shift operator on the same baler with similar material. The difference added about [N] extra outbound loads over the period, at roughly [freight amount] each.
I have also watched how it happens. On heavy nights, when the bunker fills quickly, Royce cycles the baler before the chamber is full to keep paper from backing onto the floor. That habit protects the floor, and it is a reasonable instinct. It also produces short bales, and nobody has ever told him what the short bales cost. I want to be clear in this plan that I do not know his reasons for certain. The pattern fits a floor-clearing habit, but it could also reflect something I cannot see, such as a problem with the baler's sensors, a physical difficulty or a workload issue upstream on the line.
Feedback and Coaching, Kept Apart
Feedback and coaching do different jobs, and this conversation needs both. Feedback tells a person what was observed and what it caused. Coaching helps the person work out what to do about it. The Center for Creative Leadership's Situation-Behavior-Impact model, described by Weitzel (2000), structures feedback in three parts: the specific situation, the observable behavior and its effect. Its value here is that it keeps the opening to facts I can show Royce rather than conclusions about his skill or attitude, which matters a great deal with a person who taught me the job.
Kluger and DeNisi (1996) pooled decades of feedback studies and reported a modest gain overall, alongside a sobering detail: in roughly a third of the comparisons, feedback left performance worse, and the losses clustered where the message pulled attention away from the work and toward the self. Feedback that implies Royce has become careless would be the version most likely to backfire. Feedback about one machine, one night and one number keeps the attention on the task.
Coaching begins once the facts are on the table. Whitmore (2017) sets out the GROW sequence: Goal, Reality, Options and Will. Its premise is that people commit more fully to solutions they produce themselves. Royce knows the baler better than I do. A plan where I tell him how to cycle it would waste that knowledge and confirm every worry I listed above. A plan where he proposes the fix uses it.
The Opening, as I Will Say It
I will hold the conversation in the break room at the start of a shift, not on the floor, with the scale log printed. The opening will be close to this:
"Royce, I want to talk about bale weights, and I should have raised it months ago, so that part is on me. Last Tuesday, on the night we had the two wet routes, I watched you cycle the baler early four or five times to keep the bunker from backing up. Looking at the scale log, [X] percent of the bales on our shift over the last two months came in under the mill's thousand pounds, against [Y] percent on first shift. That's been adding a few extra trucks a month, and the freight comes out of the same budget as the tonnage bonus. I don't know everything that goes into it, and you know that baler better than anyone here. What's your read?"
The opening owns the delay first, because Royce will notice it and I would rather name it than have him wonder why now. It describes one night and one behavior, then the effect in money that matters to the crew. It ends with a real question, and I will stop talking after asking it.
The opening owns my delay before it mentions his bales, because the eight months of silence are part of the problem I am raising.
Coaching Questions
Goal. "If the bales came in at weight and the floor still stayed clear, what would that look like on a heavy night?"
Reality. "What happens on the floor when you let the chamber fill? When does the bunker back up, and how often?" Here I expect to learn things I do not know, perhaps about the presort line feeding the bunker too fast or a sensor reading the chamber as full early.
Options. "What could change, on the baler or upstream, so you don't have to choose between a clean floor and a full bale?" If he names nothing, I can offer one possibility, such as asking presort to slow the infeed for ten minutes when the bunker crosses a marked line, but only after he has had room to answer.
Will. "Which of those do you want to try first, and how will we know in two weeks if it's working?"
Likely Responses and My Replies
He may say the bales have always been that way and nobody complained. In that case I will agree that nobody told him, which is true, and that this is exactly why I am raising it now, with the freight figures rather than a complaint.
He may become defensive about my promotion, perhaps saying that I learned the baler from him. I will agree that I did, say that this is why I want his ideas rather than my own, and keep the conversation on the numbers.
He may disclose something I did not know: a wrist injury that makes the tie-off harder on full bales, a sensor problem or pressure from presort. Any of those changes the plan. A health issue goes to the plant manager and human resources with his consent; an equipment fault goes to maintenance that night; an upstream problem becomes mine to fix with the presort lead.
He may agree quickly without engaging. A fast yes can mean he wants the conversation over, so I will ask him what he would try first and write down his answer, which turns agreement into a commitment he has named.
Measures of Progress
Two measures will show whether the conversation worked. The first is the scale log: the share of our shift's bales under the mill's weight, reviewed weekly for [eight] weeks against the first-shift figure. The second is less exact but just as important: whether Royce starts bringing baler problems to me before I find them. If in two months he tells me about a sensor issue or a bunker problem I had not noticed, the relationship will have moved even if the weights move slowly.
I will also check my own side. If the weights do not improve and I discover I have not followed up, the failure is mine, not his.
Dates
The conversation will take place at the start of next Tuesday's shift. The first follow-up will be two weeks later, at the same time, with the scale log in hand and his chosen fix as the first item. The second will be at eight weeks, when we review the weights together and decide whether the change stays.
Writing this plan has already done one thing: it has made the delay harder to justify. The conversation I avoided for eight months now has a date, a script and a list of what could go wrong, and that leaves me with fewer reasons to postpone it again.
References
Kluger, A. N., & DeNisi, A. (1996). The effects of feedback interventions on performance: A historical review, a meta-analysis, and a preliminary feedback intervention theory. Psychological Bulletin, 119(2), 254-284. https://doi.org/10.1037/0033-2909.119.2.254
Weitzel, S. R. (2000). Feedback that works: How to build and deliver your message. Center for Creative Leadership.
Whitmore, J. (2017). Coaching for performance: The principles and practice of coaching and leadership (5th ed.). Nicholas Brealey Publishing.
What the LI410 Unit 9 assignment asks for
The ninth unit asks you to plan a feedback and coaching conversation with someone you lead, using models from the reading. Choose a real performance issue and describe it with evidence you could show the person, since feedback built on impressions is easy to dispute. Be honest about why the conversation has not happened yet; naming the obstacles makes the plan more likely to be used. Explain how feedback and coaching differ and why this conversation needs each. Then write the opening as you would say it, followed by the coaching questions. Many sections ask you to anticipate the person's likely responses and plan a reply to each. Close with measures of progress and dates for follow-up. Three to four pages in APA 7 is typical, sometimes with the conversation guide as an appendix. Most prompts do not require you to hold the conversation before submitting.
Inside the LI410 Unit 9 example
The plan opens with the three reasons the conversation kept slipping: the operator trained the writer, applied for his job and is the most respected person on the floor. The evidence section explains why light bales cost freight, gives the operator's share of underweight bales against first shift in brackets, and describes the early cycling the writer observed, while admitting he does not know the reasons. A theory section keeps feedback and coaching apart, citing Weitzel on the Situation-Behavior-Impact model and Kluger and DeNisi on feedback that backfires when it targets the person. The opening is written word for word and owns the delay first. GROW questions follow, letting the operator propose the fix. Four likely responses each get a planned reply, including a possible injury or sensor fault. Measures cover the scale log and whether the operator starts raising problems first, and two follow-up dates close the plan.
Where the points sit in the LI410 Unit 9 rubric
Instructors grading this plan look for real evidence, a clear distinction between feedback and coaching, a usable script and planning for what could go wrong. Evidence the person could check scores higher than general concerns. The theory section earns points when it explains why each model suits this conversation rather than defining both. A written opening that describes one situation, one behavior and its effect shows the model applied. The coaching section should leave room for the person to propose solutions, since a plan that tells them the answer misses the purpose of coaching. Anticipated responses and planned replies are often the most practical part and are graded accordingly. Weitzel on SBI, Kluger and DeNisi on feedback effects and Whitmore on GROW make up the APA 7 references. Measures and follow-up dates should be specific enough that a reader could check whether the plan was carried out.
LI410 Unit 9 help: mistakes that cost points
Many feedback plans describe the problem in judgments, careless or unmotivated, which the SBI model is designed to avoid. Others blend feedback and coaching into one lecture, with the leader doing all the talking. A common gap is the missing obstacles section, even though the reasons a conversation keeps slipping often determine whether the plan is used. Scripts are sometimes too polished to say aloud. Writers also forget to plan for a disclosure, such as a health issue or a problem upstream, that would change the conversation entirely. If the person is senior to you in age or tenure, say so in the plan and keep the opening on observed behavior. Leave out names and anything that could identify the employee. Describe the performance issue and the person in general terms, and a writer will draft the evidence section, the opening and the replies with you.
Get an LI410 Unit 9 example written to your instructions
Outline the conversation you keep postponing: who it is with, what they do and its effect, and why it has not happened yet. Add the Unit 9 prompt and rubric. A plan built on whichever feedback and coaching models your section assigned reaches you in 24-48h, the first one free, with the other person identified only by position. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More LI410 papers and BS in Business Administration samples
- LI410 Unit 1: Leader Who Shaped Me Post
- LI410 Unit 2: Self-Assessment Interpretation
- LI410 Unit 3: Leadership Style Analysis
- LI410 Unit 4: Team Dynamics Reflection
- LI410 Unit 5: Conflict Case Reflection
- LI410 Unit 6: Seminar Reflection on LMX
- LI410 Unit 7: Change Leadership Analysis
- LI410 Unit 8: Ethical Leadership Scenario
- LI410 Unit 10: Leadership Development Plan
LI410 Unit 9 questions, answered
Do I have to hold the conversation before submitting?
Usually not. Many Unit 9 prompts ask for the plan, and some add an optional reflection if the conversation happens during the term. Planning without holding it is honest as long as the paper says so. If you do hold it, a short note on what went as scripted and what did not can strengthen a later unit or the final plan.
What is the difference between feedback and coaching here?
Feedback tells the person what was observed and what it caused; coaching helps them work out what to do about it. The first is mostly the leader speaking, the second mostly the leader asking. Plans that use SBI for the opening and GROW for what follows show both, and many rubrics in leadership courses look for exactly that pairing.
What if the person is senior to me in age or tenure?
That is common and worth naming in the plan, since it often explains the avoidance. Keeping the opening strictly to observed behavior and its effect helps, because it keeps the conversation away from rank. Asking for the person's own view early, and meaning it, usually matters more with a senior colleague than with a new one.
Where can I find a free LI410 Unit 9 sample paper?
This page contains a full LI410 Unit 9 feedback and coaching plan for a senior baler operator, with the evidence, a word-for-word opening, GROW questions, planned replies, measures, references and margin notes.
Why does the plan open by owning the delay?
The operator will notice the eight months of silence. Naming it first keeps him from wondering why now and treats the delay as part of the problem, which keeps the opening fair to someone who trained the writer.