Six Weeks Planned, Nineteen Taken: A Unit 6 Seminar Reflection on the Line Nobody Challenged
[Student Name]
Purdue University Global
GM592: Project Planning and the Project Plan
Unit 6 Seminar Reflection
[Instructor Name]
[Date]
The sawmill, the classmates and the mills described are composite; the research cited is real.
The Log Deck
Two years ago at Tygart Ridge Hardwoods, we replaced the log deck that feeds the headrig. I planned six weeks. It took nineteen. At the time I blamed three causes: the steel fabricator delivered the deck frame five weeks late, the concrete footings had to be redone after an inspection, and a wet spring kept the crane off the yard for two weeks. I told the owner it was bad luck, mostly the fabricator.
The Other Cases
Classmates brought similar stories. Kyle, a software lead, described a feature his team estimated at two weeks that took eleven, with each delay explained by a different surprise. Nora, an electrical estimator, said her company's bids ran long every winter, and that every winter the estimators blamed the weather as if it were new. Listening to them, I noticed that each of us had a separate excuse for each delay and no explanation for why we were always late.
The Question
Then Hector, who manages a bottling plant, asked me about my current project. I had described the kiln and mentioned the eight-day cycle for 4/4 red oak. He asked, "How long until the new kiln actually runs at eight days?" I said it would run at eight days from the first saleable charge. He said that every new line in his plant had taken months to reach its rated speed.
I checked my estimate worksheet that evening. It used ten days for the trial charge, but every charge after that was planned at the vendor's nominal cycle. No one had questioned that line, including me.
My worksheet assumed the kiln would dry at its rated cycle from the first saleable charge, an assumption that every other new installation described in the seminar contradicted.
What the Research Explains
Daniel Kahneman and Amos Tversky argued that people forecasting a project focus on its specific plan and neglect the distribution of outcomes for similar projects, and that forecasts improve when they start from that wider class (Kahneman & Tversky, 1979). Bent Flyvbjerg turned the idea into a method he calls reference class forecasting: gather the real outcomes of projects like yours, then move your own estimate toward them (Flyvbjerg, 2006).
That described my log deck exactly. I had planned from the inside, step by step, and treated each delay as an accident. Roger Buehler, Dale Griffin and Michael Ross found that people predicting their own task times focus on plans for the future and discount their past experience, even when they remember being late before (Buehler et al., 1994). I had been late on every yard project I could name. I had never asked how long log decks at other mills had taken.
So I looked for a reference class for the kiln. The state hardwood association's newsletter has carried accounts from three mills that installed package kilns in the last five years. All three reported that their first season's cycles ran 20 to 40 percent longer than the vendor's nominal schedule, while operators learned the controls and adjusted schedules for their own lumber. Hector's question had a factual answer, and it was not the one my worksheet assumed.
Why the Fabricator Took the Blame
Looking back at the log deck, the fabricator's five weeks were real, but they were not the reason I was wrong. If the fabricator had been on time, the project would still have taken about fourteen weeks, more than twice my estimate. The footings, the weather and a dozen smaller problems would still have happened. Blaming the fabricator let me keep my method, because it made the overrun look like one supplier's failure rather than the normal result of planning without a reference class. The seminar made me see that a list of excuses, one for each delay, is itself a sign of inside-view planning, since the outside view would have expected some delays without knowing in advance which ones.
What Changed
I have revised the worksheet. The first three saleable charges now carry a cycle of about 11 days, 40 percent above nominal, and the following five carry about 10 days. Only after that does the plan assume eight. The change moves the date when the kiln can supply the cabinet maker's full monthly volume by about three weeks, and I have told the sales manager before the customer hears a date. I also added a new column to the worksheet: for every duration, the reference class it was checked against, or the word none.
References
Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366-381. https://doi.org/10.1037/0022-3514.67.3.366
Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. Project Management Journal, 37(3), 5-15. https://doi.org/10.1177/875697280603700302
Kahneman, D., & Tversky, A. (1979). Intuitive prediction: Biases and corrective procedures. TIMS Studies in Management Science, 12, 313-327.
Reading the GM 592 Unit 6 instructions
For GM592 Unit 6, the reflection records in your own voice what an estimating seminar did to your thinking. Describe a project of your own that ran late and the causes you blamed at the time. Summarize the cases classmates brought briefly. Then identify the question or idea that changed your view, and apply research on planning errors, such as the planning fallacy and reference class forecasting, to your own case and to a plan you are working on now. Look for an outside view: how long did comparable efforts actually take? Explain why the causes you blamed were not the real reason you were wrong. Close by stating exactly what you changed in a current plan or worksheet. Expect just under two first-person pages, written the same way for attendees and the written option, with APA 7 citations.
Inside the GM592 Unit 6 example
The reflection describes the log deck: six weeks planned, nineteen taken, with a late frame, redone footings and a wet spring blamed. Kyle's software feature and Nora's winter bids show the same pattern of a separate excuse for each delay. Hector's question about the kiln's rated cycle leads the writer to her worksheet, which assumed eight days from the first saleable charge, the assumption the highlighted sentence identifies. Kahneman and Tversky on neglecting the distribution of outcomes, Flyvbjerg's reference class forecasting and Buehler, Griffin and Ross on discounting past experience explain the log deck. Three mills' newsletter accounts report slower cycles in their first season. A section shows the deck would have taken fourteen weeks even with an on-time fabricator. The worksheet now carries 11-day and 10-day cycles before eight, and a reference class column.
GM592 Unit 6 rubric: what earns full points
On the GM592 rubric this reflection is judged on three things: a candid account of a past estimate, a visible turning point and a change to a plan still in progress. Instructors look for the causes blamed at the time stated plainly, then reexamined. Classmates' cases should be summarized briefly and connected to a pattern. Applying research on planning errors to the writer's own case earns more than defining it. Finding an actual reference class, such as other installations, shows the outside view in practice. Explaining why the blamed causes were not the real problem shows insight. A specific change to a current worksheet ties the reflection to the course. Kahneman and Tversky in TIMS Studies in Management Science, Buehler, Griffin and Ross in Journal of Personality and Social Psychology and Flyvbjerg in Project Management Journal form the references in APA 7.
Common GM592 Unit 6 mistakes, and how to avoid them
Many GM592 Unit 6 reflections retell a late project and conclude that the writer will plan more carefully, which changes nothing. Others summarize the planning fallacy without applying it. A frequent gap is the reference class: writers rarely look up how long similar projects actually took, though that is the step that corrects the estimate. Some reflections stop at the past case and never touch a current plan. Describe your late project and what you blamed, summarize classmates' cases, name the question that changed your view, apply the research, find a real reference class, explain why your excuses missed the point and state what you changed.
Get a GM592 Unit 6 example written to your instructions
Seminars on estimating draw different cases each term. Describe the one yours discussed, or paste the questions from the written alternative, then attach the rubric plus any estimate worksheet or schedule already drafted. The opening reflection is free, ready in 24-48h, and turns the room's argument onto an estimate the writer can still change. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More GM592 papers and MS in Management samples
- GM592 Unit 1: Estimate vs Commitment Discussion Post
- GM592 Unit 2: Dry Kiln Requirements Document
- GM592 Unit 3: Dry Kiln Scope Statement
- GM592 Unit 4: Dry Kiln Work Breakdown Structure
- GM592 Unit 5: Estimate Basis Worksheet
- GM592 Unit 7: Schedule Network Diagram
- GM592 Unit 8: Resource and Cost Baseline
- GM592 Unit 9: Quality and Reporting Plan
- GM592 Unit 10: Integrated Project Plan
- GM591 Unit 6: Ending Projects Seminar Reflection
- GM586 Unit 6: Popular vs Transformational Reflection
- GM585 Unit 6: Coaching Spectrum Seminar Reflection
- GM500 Unit 6: Snowplow Routes Seminar Reflection
GM592 Unit 6 questions, answered
Does the reflection have to involve my own estimate going wrong?
Not necessarily, but reflections usually land harder when the concept reaches something the writer still controls. A classmate's case can carry the argument, provided the reflection then applies it to your own current plan or work. The example uses a past failure as the entry point and a live worksheet as the destination.
Where can I find a free GM592 Unit 6 sample paper?
This page carries a full GM592 Unit 6 seminar reflection on the planning fallacy and reference class forecasting, applied to a sawmill's log deck and its dry kiln worksheet, with APA 7 references.
What is reference class forecasting?
Bent Flyvbjerg's method of gathering the actual outcomes of projects similar to yours and adjusting your estimate toward them. In the sample, three mills' first-season kiln cycles provide the reference class.
Why was the steel fabricator not the real cause?
Even with the frame on time, the log deck would have taken about fourteen weeks, more than twice the estimate. Blaming one supplier hid the inside-view planning that made the estimate wrong.
What changed in the worksheet?
The first three saleable charges now carry 11-day cycles and the next five 10-day cycles before the plan assumes eight, and a new column records the reference class each duration was checked against.