| Course | GM591 Strategic Project Selection and Initiation |
|---|---|
| Unit | Unit 10 |
| Paper type | Selection recommendation |
| Length | About 900 words, 6 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | MS in Management |
| Updated | October 2026 |
Free sample paper for GM591 Unit 10
Two Obligations, Then Five in Order: A Unit 10 Project Selection Recommendation to a Cooperative Board
[Student Name]
Purdue University Global
GM591: Strategic Project Selection and Initiation
Unit 10 Selection Recommendation
[Instructor Name]
[Date]
The electric cooperative, its board, its projects and every figure are composite and illustrative; the frameworks cited are real.
Memo
To: Chair, Board of Directors, Coteau Plains Electric Cooperative From: Planning Committee, prepared by the Business Systems Analyst Date: March 3 Subject: Recommended capital portfolio for the coming cycle
Summary
The committee recommends funding two obligations outside the ranking and five discretionary projects in the order below. Each recommendation reflects value discounted at 6.5 percent, the cooperative's borrowing cost, the weighted score the committee fixed before scoring, the quarter the project can start given staff capacity, and the condition under which it would stop.
Obligations, Funded Outside the Ranking
Pole-loading remediation, including the drone inspection method merged into it, is required by the state safety code within three years. Control network segmentation must be finished for the cooperative's cyber policy to renew. Both are funded first, and their staff needs were counted before any ranked project in the capacity review.
Ranked Discretionary Projects
First: meter replacement. NPV $3.58 million; weighted score 75.0; start in the second quarter, with a pilot district, after the network model correction begins; stop if billing integration fails at Gate 1 or if the meter reading and truck roll savings miss their targets by over a fifth after two years of tracking.
Second: the outage system and member app. NPV $0.60 million; weighted score 79.0; start in the third quarter, once the corrected network model is available; stop if the vendor's system fails acceptance testing against the corrected model.
Third: vegetation analytics. NPV $0.59 million; weighted score 77.0; start in the fourth quarter, after the GIS peak; stop if the first year does not repeat at least half of the trial district's reduction in tree-related outage minutes.
Held: the fiber pilot's phase two. NPV of the full program negative $3.37 million at current assumptions; weighted score 46.0; held under the Gate 3 conditions the committee adopted in February.
Declined: community solar. NPV negative $0.41 million; weighted score 45.0; declined for this cycle.
Meter replacement ranks first even though the scoring model placed it third, because it creates three times the value of the other two positive projects combined and the outage system depends on its data.
Why the Order Departs From the Scores
The weighted scoring model placed the outage system first, vegetation analytics second and meter replacement third, within four points. The committee's recommendation reverses the first and third for two reasons. First, meter replacement's net present value of $3.58 million is about six times that of either of the other two, a gap the scoring model narrows because money is one criterion of six, weighted at a fifth of the total. Second, the outage system will predict outages far more accurately once meters report power loss automatically, so funding it first would deliver less than its score assumes. Norman Archer and Fereidoun Ghasemzadeh recommend that interdependencies between projects be considered explicitly at the portfolio stage, because projects scored one at a time can miss them (Archer & Ghasemzadeh, 1999).
A Response to the Case for Fiber
Director Lund has argued that broadband is the most important service the cooperative could add for its members, and that holding phase two signals the board has lost interest. The committee does not agree with the second point. Fiber is held, not rejected. The pilot continues to sell service, and phase two capital will be released in October if sign-ups reach 32 percent of homes passed, the state grant is approved and phase two bids come in below $5,800 per home. These conditions are what the program needs to add value rather than lose it. The $7.0 million already spent on the pilot is not part of the case either way; Hal Arkes and Catherine Blumer showed how past investment pulls decisions toward continuing (Arkes & Blumer, 1985), and the committee has tried to judge only the money still to be spent. If they are met, fiber will enter the next cycle with a stronger case than any other project in this one.
The committee also recognizes that broadband serves members in ways the cooperative's financial measures do not capture. If the board wishes to fund fiber as a member service regardless of value, that is a choice the board can make, but it should do so knowingly, with the expected loss stated, and not by relaxing the gate conditions.
Solar's Path Back
Solar's value turns positive, by roughly a quarter of a million dollars, if the cooperative can borrow for it at 5 percent. If a federal or state program offers financing at or below that rate, the committee will bring solar back for review without waiting a full cycle.
Capacity
The capacity review found the cooperative's two GIS analysts needed at 190 percent of their hours under the original plans. With a dedicated network model correction, vegetation analytics deferred, contract support for segmentation and solar declined, every role stays at or under 105 percent through all four quarters. The Project Management Institute's portfolio standard treats capacity as a selection constraint, not a scheduling detail (Project Management Institute, 2017). This portfolio fits the people available to deliver it.
References
Archer, N. P., & Ghasemzadeh, F. (1999). An integrated framework for project portfolio selection. International Journal of Project Management, 17(4), 207-216. https://doi.org/10.1016/S0263-7863(98)00032-5
Arkes, H. R., & Blumer, C. (1985). The psychology of sunk cost. Organizational Behavior and Human Decision Processes, 35(1), 124-140. https://doi.org/10.1016/0749-5978(85)90049-4
Project Management Institute. (2017). The standard for portfolio management (4th ed.).
GM591 Unit 10 instructions, in plain terms
The final GM591 unit asks you to recommend a project portfolio to the person or body that will decide. Write in memo form, standing alone, and put the decision first. List obligations separately, funded outside the ranking. For each discretionary project give its financial value, its weighted score, the quarter it can start given capacity and the condition under which it would stop. Where your order departs from the scoring model or the financial screen, say so and explain the reason, such as dependencies between projects. Answer the strongest objection from a sponsor whose project is held or declined, respectfully and with conditions. Say what would bring a declined project back. Close by confirming the portfolio fits the people available. Expect about five pages with a one-page ranking table or its equivalent, citing portfolio selection sources in APA 7.
Inside the GM591 Unit 10 example
The memo from the planning committee to the board chair opens with a summary of the four factors behind each ranking. Obligations come first. The ranked list gives meter replacement at $3.58 million and 75.0, starting in the second quarter with a pilot district; the outage system, worth about $600,000 with a score of 79.0, from the third quarter; vegetation analytics at $0.59 million and 77.0, starting in the fourth; fiber held at negative $3.37 million and 46.0; and solar declined at negative $0.41 million and 45.0. The highlighted sentence explains why meter replacement leads, and Archer and Ghasemzadeh support weighing interdependencies. A response to Director Lund explains that fiber is held, not rejected, sets aside the $7.0 million with Arkes and Blumer and invites a knowing choice if the board values broadband beyond its return. Solar's path back and capacity close the memo.
GM591 Unit 10 rubric: what earns full points
GM591 rubric credit for this recommendation depends on a clear decision supported by the earlier stages and an honest account of where it departs from them. Instructors look for obligations separated from choices. Each ranked project should carry its value, score, start quarter and stop condition, which shows the portfolio is deliverable and governed. Explaining any departure from the scoring model, especially through dependencies, carries significant weight. Answering a sponsor's objection with respect and conditions earns credit because sponsors are among the readers. A path back for declined projects keeps the decision open to new facts. Confirming capacity proves the portfolio can be delivered. APA 7 citations cover Archer and Ghasemzadeh on interdependent projects, Arkes and Blumer on sunk cost and PMI's standard on capacity.
GM591 Unit 10 help from the desk
Many GM591 Unit 10 recommendations simply copy the scoring model's order and never reconcile it with the financial results. Others ignore capacity, recommending a portfolio the staff cannot deliver. A frequent gap is the sponsor: a declined or held project's champion will read the memo, and silence about their case reads as dismissal. Some writers decline projects without saying what would change the answer. Put the decision first, separate obligations, give each project its value, score, start and stop condition, explain any departure from earlier rankings, answer the strongest objection, offer a path back and confirm the portfolio fits the people.
Get a GM591 Unit 10 example written to your instructions
Gather the candidates and whatever screens your earlier units produced, financial figures, scores, capacity notes, gate conditions, and name the person the recommendation must persuade. The Unit 10 prompt and rubric round it out. A first recommendation is free, returned in 24-48h, with the strongest objection answered in its own section. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More GM591 papers and MS in Management samples
- GM591 Unit 1: Project Escalation Discussion Post
- GM591 Unit 2: Project Screening Matrix
- GM591 Unit 3: NPV and Payback Screening Exercise
- GM591 Unit 4: Weighted Scoring Model
- GM591 Unit 5: Meter Replacement Business Case
- GM591 Unit 6: Ending Projects Seminar Reflection
- GM591 Unit 7: Meter Replacement Project Charter
- GM591 Unit 8: Fiber Pilot Gate Review Memo
- GM591 Unit 9: Portfolio Capacity Review
- GM586 Unit 10: Plant Turnaround Leadership Paper
- GM585 Unit 10: Coaching Philosophy Paper
- GM543 Unit 10: Front-Back Design Recommendation
- GM541 Unit 10: Uptime Service Transformation Plan
GM591 Unit 10 questions, answered
What if my financial and scoring results disagree?
Say so and reconcile them. Explain what each screen measures, why they diverge, and which consideration you are using to decide, such as value, dependency or risk. A recommendation that hides the disagreement looks either careless or selective. One that names it and breaks the tie openly is usually the strongest part of the paper.
Should the recommendation include projects that were declined?
Yes. Listing declined projects with reasons shows the portfolio was actually chosen, and naming what would change the decision, such as a grant or a lower financing cost, keeps them from being dismissed permanently. Sponsors of declined projects are among the recommendation's readers, and a clear reason tends to be received better than silence.
How long should the final recommendation be?
Long enough to support the decision and short enough for a busy reader: often four to six pages with a one-page summary or table. Many prompts specify a length. Put the decision first, then the reasoning, and move detailed calculations to an appendix, since a board member should be able to act on the first page alone.
Where can I find a free GM591 Unit 10 sample paper?
This page carries a full GM591 Unit 10 project selection recommendation to an electric cooperative's board chair, with obligations, a ranked portfolio, a response to fiber's champion and APA 7 references.
Why does meter replacement rank first when the scoring model placed it third?
It creates about six times the value of either of the next two projects, a gap the scoring model compresses, and the outage system depends on the power-loss data new meters provide. Funding the outage system first would deliver less than its score assumes.