| Course | GB560 Designing, Improving, and Implementing Processes |
|---|---|
| Unit | Unit 7 |
| Paper type | Process design proposal |
| Length | About 1,110 words, 7 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for GB560 Unit 7
Refund on Arrival, Inspect the Expensive Ones: A Unit 7 Process Design Proposal for an Appliance Returns Center
[Student Name]
Purdue University Global
GB560: Designing, Improving, and Implementing Processes
Unit 7 Process Design Proposal
[Instructor Name]
[Date]
The seller, its returns center and every figure and estimate are composite and illustrative; the methods and sources cited are real.
The Design in One Paragraph
Returns are sorted at the dock into three paths by value and history. Ordinary returns are refunded when they arrive and graded afterward. Expensive returns are graded and checked by loss prevention before any refund. Everything else keeps the current grading-first sequence. Exceptions leave the main path at the bench into their own lane, owned by one named lead. The daily export and the next-morning keying disappear because grading writes directly to the refund system.
Future-State Map
The map uses the same five lanes and symbols as the Unit 3 current state map, so the two can be compared step by step, and a legend marks each removed step.
Dock receiving. The dock scan now reads the carrier tracking number and matches it to the return authorization automatically, replacing the barcode that scanned poorly. The scan assigns each return to a path.
Fast lane. Returns under $150 from accounts with no dispute history, about 71 percent of volume. The refund is issued at the dock scan and posts to the shopper's card at the payment processor's next daily settlement, usually within a day. The unit is then unpacked and graded as before, but grading no longer holds up the refund.
Inspection lane. Returns priced above $400, about 4 percent of volume. The unit is graded and checked by loss prevention before the refund posts, which meets requirement four from Unit 2.
Standard lane. Everything else, about 25 percent of volume, keeps the grading-first path, but the grade now triggers the refund directly.
Exception lane. Returns that cannot follow any lane without a decision outside the procedure leave at the bench into a drawn lane with five branches, one for each kind of exception counted in Unit 6. One named exception lead owns the lane and clears it every day.
Removed steps. Four boxes from the old map are gone: the internal label, the afternoon export hold, the export file itself and next-morning refund keying.
The fastest refund the company can offer is one that does not wait for anything, so the design lets most returns stop waiting at the dock.
Why Refund Before Inspection
Many retailers refund on carrier scan for low-value items and trusted customers, accepting a small loss rate in exchange for speed and fewer service contacts. The proposal prices that exposure rather than assuming it away. Fast-lane returns number about 53,500 a year with an average refund of about $71. If 0.35 percent turn out to be empty boxes or the wrong item, a rate based on loss prevention's case history for low-value returns, the added loss is about $13,300 a year.
Against that, the fast lane removes the wait that causes most refund-status contacts and chargebacks. If it removes 64 percent of refund-status contacts, about $54,200 a year, and nearly all chargebacks filed before a refund posts, about $27,100, the avoided cost is roughly $81,000 a year. The exposure is about a sixth of the saving. The 0.35 percent loss rate is the assumption most in need of testing, and the Unit 8 pilot sets a limit on it.
Why Grading Stays Manual
Grading a returned appliance involves judgments a rule handles badly: whether a scratch on an air fryer matters, whether a smell means use, whether a missing manual changes the grade. A rule-based grade would produce confident errors that reach the next buyer faster, adding to failure mode four. The design removes only steps that were pure waiting or copying, and leaves judgment where it is. Fraud review on expensive units stays with loss prevention for the same reason. Davenport (1993) argues that process redesign should use technology to remove handoffs and delays, not to replace the judgment that gives a process its value, and the proposal follows that line.
The Exception Lane
The lane has five branches. Returns without a usable authorization go to an order search, now much rarer because the tracking number match replaces the barcode. Incomplete bundles go to a shopper contact with a two-day reply window. Gift returns go to a purchaser lookup. Recalls follow the recall procedure. Marketplace items are routed to their seller. The exception lead clears the lane daily and reports any item older than 48 hours each morning. Hammer (1990) warned that exceptions handled informally consume the time the main path saves, and drawing the lane is the response.
Change Table
Each change is linked to the Unit 5 failure it targets.
Tracking-number match at the dock. Removes most of mode 2, returns without usable authorization.
Fast-lane refund at the dock scan. Removes most of mode 1, refund-status contacts, and mode 5, chargebacks before refund.
Grade writes directly to the refund system. Reduces mode 1 for the standard lane and removes the keying step where some wrong amounts, mode 3, began.
Inspection lane for units above $400. Keeps the check that catches mode 6, swapped parts.
Manual grading kept, with a regrade sample. Keeps the check that catches mode 4, defective units graded sellable.
Exception lane with an owner. Prevents exceptions from waiting without a decision.
Expected Effects
The proposal expects median dock-to-refund time to fall from 3.34 days to about one day, driven by the fast lane and the removal of the export and keying. Touch time should fall slightly, since the internal label and keying disappear, though grading time does not change. The Unit 2 refund-timing requirement should be met for the fast and standard lanes; the inspection lane may need a day longer.
What the Design Does Not Change
The bulk carton wait before unpacking, the largest single delay in Unit 4, is reduced by the dock sort but not removed, because unpacking still happens at a separate bench. For fast-lane returns it no longer delays the refund, so it matters less to shoppers. It still delays restocking, so the inventory planner's 48-hour requirement may remain hard to meet. That is noted as a risk for the pilot to measure.
Assumptions to Test
The 71 percent fast-lane share, the 0.35 percent loss rate and the 64 percent reduction in contacts are estimates. Each will be measured in the Unit 8 pilot. Spear and Bowen (1999) describe well-designed processes as built to test their own assumptions, and the pilot is where this one is tested.
References
Davenport, T. H. (1993). Process innovation: Reengineering work through information technology. Harvard Business School Press.
Hammer, M. (1990). Reengineering work: Don't automate, obliterate. Harvard Business Review, 68(4), 104-112.
Spear, S., & Bowen, H. K. (1999). Decoding the DNA of the Toyota Production System. Harvard Business Review, 77(5), 96-106.
The Purdue Global GB560 Unit 7 instructions
In GB560 Unit 7 you propose a redesigned process. Summarize the design in one paragraph. Draw a future-state map using the same lanes and symbols as your current state map, with removed steps marked in a legend. Explain each new path and who it serves. Price any new risk the design accepts and set it against the costs it avoids. Explain what you chose not to automate and why. Draw a path for exceptions rather than dropping them. Map each change to the failure it targets. State expected effects, what the design does not change and the assumptions a pilot must test. Expect about seven pages, citing process design sources in APA 7.
Inside the GB560 Unit 7 example
The one-paragraph summary sorts returns into three paths at the dock, and the future-state map reuses the Unit 3 lanes with a tracking-number match replacing the barcode. The fast lane covers about 71 percent and the inspection lane about 4 percent, and the highlighted sentence explains why most returns stop waiting at the dock, so the refund no longer depends on grading. A 0.35 percent loss rate on about 53,500 refunds prices the exposure at $13,300 against about $81,000 avoided. Davenport supports keeping grading manual, and Hammer frames a five-branch exception lane. A change table links each step to a Unit 5 failure. The remaining carton wait and Spear and Bowen on testable designs close it.
Reading the GB560 Unit 7 grading rubric
Instructors grading a GB560 design proposal look for a future state that can be compared step for step with the current one. A one-paragraph summary earns points. Reusing the current map's lanes and symbols shows discipline. Explaining each path and its receivers shows clarity. Pricing accepted risk against avoided cost shows financial judgment. Explaining what stays manual shows restraint about automation. Drawing an exception path shows the design covers real work. A table mapping changes to failures shows every change has a purpose. Admitting what the design leaves unchanged shows honesty. References are Davenport's process innovation book, Hammer's reengineering article and the Spear and Bowen study.
GB560 Unit 7 help: mistakes that cost points
Many GB560 Unit 7 proposals draw a future state far simpler than the current one by leaving exceptions off the map, which guarantees they return as workarounds. Others automate judgment, such as grading, and produce confident errors that reach customers faster. A frequent gap is risk: a design that speeds refunds may accept losses, and the proposal should price them. Some writers list improvements without tying each to a measured failure. Summarize the design, map it with the old lanes, explain each path, price new risks, keep judgment human where it matters, draw exception paths, link changes to failures, state effects and limits, and list assumptions for the pilot.
Get a GB560 Unit 7 example written to your instructions
Send your earlier analyses of the process, or a paragraph on each, plus the Unit 7 prompt and rubric. On those findings the proposal is built, with a future-state map in the same format as your current state, each change traced to a cause and every manual step defended. The first custom sample is free of charge and normally takes 24-48h. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More GB560 papers and MBA samples
- GB560 Unit 1: Discussion Board Post
- GB560 Unit 2: Process Requirements Memo
- GB560 Unit 3: Current State Map
- GB560 Unit 4: Cycle Time Analysis
- GB560 Unit 5: Failure Mode Review
- GB560 Unit 6: Seminar Reflection
- GB560 Unit 8: Pilot Plan
- GB560 Unit 9: Control Plan
- GB560 Unit 10: Implementation Report
- GB550 Unit 7: Capital Budgeting Analysis
- GB546 Unit 7: Recruiting Funnel Analysis
- GB545 Unit 7: Incentive Plan Proposal
- GB542 Unit 7: Knowledge Transfer Plan
GB560 Unit 7 questions, answered
Why not automate grading too?
Because grading a returned appliance involves judgments a rule handles badly: whether a scratch matters, whether a smell means use, whether a missing manual changes the grade. The sample keeps grading manual and removes only the steps that were pure waiting or copying. A design that automates judgment tends to produce confident errors, which then reach customers faster.
Is refunding before inspection a normal practice?
Many retailers refund on carrier scan for low-value items and trusted customers, accepting a small loss rate in exchange for speed and fewer service contacts. The sample prices that exposure rather than assuming it away. Whether it suits a given company depends on its margins, fraud history and customer promise, which the proposal states as assumptions for the pilot to test.
How detailed should the future-state map be?
As detailed as the current-state map it replaces, so the two can be compared step for step. The sample uses the same lanes and symbols as its Unit 3 map and marks removed steps in a legend. A future state far simpler than the current one is fine, provided the exception paths are drawn rather than dropped.
Where can I find a free GB560 Unit 7 sample paper?
This page carries a full GB560 Unit 7 process design proposal for a composite returns center, with a future-state map, priced fraud exposure, an exception lane, a change table and APA 7 references.
What steps does the design remove?
The internal label, the 16:00 export hold, the export file and next-morning refund keying. Grading now writes directly to the refund system, so finished grades no longer wait for a clock.