| Course | NU803 Change Management and Clinical Data Analysis |
|---|---|
| Unit | Unit 1 |
| Paper type | Change model application |
| Length | About 1,090 words, 6 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | Doctor of Nursing Practice (DNP) |
| Updated | September 2026 |
Free sample paper for NU803 Unit 1
Phase Two Pointed at Lunchtime: Applying Lippitt's Seven Phases of Planned Change to a Steroid Hyperglycemia Bundle Already Moving on Two Composite Medical Units
[Student Name]
Purdue University Global
NU803: Change Management and Clinical Data Analysis
Unit 1 Change Model Application
[Instructor Name]
[Date]
The units, staff and figures are composite and continue the project begun in the proposal course; numbers are bracketed.
Why a Change Model at This Stage
The bundle, which ties afternoon glucose checks to high-dose steroid orders and adds a paging rule, a taper reminder and a discharge check, was approved in the proposal course and is now in its education weeks on 4 North and 4 South. A change model is useful at this point because approval is not adoption. Lippitt, Watson and Westley described planned change as a process moving through seven phases, from diagnosing the problem to ending the helping relationship, with a change agent guiding a client system through each (Lippitt et al., 1958). The model suits this project because its phases include an explicit assessment of the system's capacity to change and a phase devoted to maintaining the change, both of which the bundle needs.
Phase 1: Diagnose the Problem
The problem was diagnosed in the proposal: patients started on high-dose glucocorticoids are checked, if at all, at 0600, when a morning steroid has barely begun to act, and roughly [31] in every 100 monitored steroid days reach 250 mg/dL or more. Lippitt's first phase asks who shares the diagnosis. On 4 North and 4 South, nurses and hospitalists largely agreed once they saw the glucose curve, but patient care technicians, who do most checks, had not been part of the diagnosis at all.
Phase 2: Assess Motivation and Capacity for Change
This phase asks whether the system wants to change and whether it can. Motivation was high among nurses, who had seen patients thirsty and unwell by late afternoon. Capacity was a different matter. Mapping the day hour by hour showed that pre-lunch checks, due between [1100] and [1130], coincide with the first lunch break wave, when each unit runs with [two] fewer staff. On both units, covering for a colleague at lunch has always meant answering call bells, and scheduled work waits. The same analysis showed that pre-dinner checks, due near [1600], fall at shift overlap for technicians, when capacity is higher.
The model's question about capacity found the problem that motivation could not solve: the people who would do the pre-lunch checks are at lunch.
The framework analysis in the proposal had named this social opportunity barrier as the thin row; Lippitt's second phase turned it into a scheduling fact that could be acted on.
What an Hour on 4 North Looked Like
To test the capacity finding, the change agent spent the hour from [1100] to [1200] on 4 North on three weekdays. On each day, lunch trays began arriving at [1130], both technicians went to lunch in turn between [1115] and [1215], and the nurses who covered them were also passing noon medications. On the first day, [four] patients on qualifying steroids were due pre-lunch checks; [one] was checked before the tray arrived, [two] after the patient had begun eating, and [one] not at all. On the other two days the pattern was similar. Nobody was ignoring the checks. The hour simply held more scheduled work than people, and the checks, being new, were the task that slipped. That observation, more than any survey, persuaded the nurse managers that break timing had to change if the pre-lunch target was to be reached.
Phase 3: Assess the Change Agent's Motivation and Resources
The change agent is the DNP student, a nurse practitioner on the hospitalist team who knows both units well, with the two nurse managers as sponsors. Resources include two protected hours a week, the pharmacist's help with the order set, and informatics support already approved. The limit is authority: the change agent cannot change break schedules, which belong to the nurse managers.
Phase 4: Select Progressive Change Objectives
The objectives were staged: first, the order-set trigger live and staff trained; second, pre-dinner checks at [80] percent, the easier target; third, pre-lunch checks at [80] percent, which depends on the break schedule; and fourth, a shift in hyperglycemic days. Staging the check targets separately follows directly from phase two's finding. It also gives the units an early success on pre-dinner checks while the harder lunchtime problem is worked out, which matters for morale in the first weeks of a change that staff did not ask for.
Phase 5: Choose the Change Agent's Role
Lippitt's model asks the change agent to choose a role, such as expert, facilitator or catalyst. For this project the role is mostly facilitator: bringing the nurse managers the lunchtime data, helping them decide on a solution, and supporting technicians rather than instructing them. For the order set and NPH suggestion, the role is closer to expert.
Phase 6: Maintain the Change
Maintenance is planned from the start, not left to the end of the project. The weekly run chart will be shown at huddles, and the break-coverage list will be rewritten into the technicians' assignment sheet, not posted as a separate reminder, because a previous attempt on these units to add afternoon checks by memo reverted within weeks when the assignment sheet was left unchanged. Kotter warned that change is lost when it is not anchored in how an organization routinely works (Kotter, 1995).
Phase 7: Terminate the Helping Relationship
The final phase transfers ownership to the units. The plan is to hand the routine to a diabetes resource nurse and fold the weekly report into the point-of-care testing coordinator's existing monthly report, so the routine survives the change agent's departure.
What the Model Does Not Do
Lippitt's model describes the change agent's work well, but it says little about the emotional side of change for staff, or about power and politics among groups. It does not explain why technicians, who gain nothing from the change, should take it on. Those questions are taken up in the stakeholder analysis and in the readiness assessment, which draws on a theory that treats readiness as shared commitment and shared belief in collective capability (Weiner, 2009).
Conclusion
Applied to a change already moving, Lippitt's phases were most useful for what phase two revealed: a capacity gap at lunchtime that motivation alone could not close. That finding changed the objectives, staging pre-lunch and pre-dinner targets separately, and pointed the maintenance plan toward the assignment sheet.
References
Kotter, J. P. (1995). Leading change: Why transformation efforts fail. Harvard Business Review, 73(2), 59-67.
Lippitt, R., Watson, J., & Westley, B. (1958). The dynamics of planned change. Harcourt, Brace.
Weiner, B. J. (2009). A theory of organizational readiness for change. Implementation Science, 4, Article 67. https://doi.org/10.1186/1748-5908-4-67
What the NU803 Unit 1 assignment asks for
The opening NU803 task pairs a named change model with a real change, one you lead or one already moving where you work. Most versions expect the model's origins and phases, an application of each phase to real events, and a discussion of what the model revealed and what it missed. Papers near 2,000 words are the norm, and the rubric favors applications that test the model against actual decisions, show at least one place where the model changed the plan, and name its limits rather than treating it as complete. Older models such as Lippitt's remain acceptable when the paper uses them to reveal something; walking through phases without a finding in any of them tends to score poorly.
How the NU 803 Unit 1 example is put together
The paper explains why a change model matters between approval and adoption and introduces Lippitt's seven phases. Phase one asks who shares the diagnosis and finds technicians left out. Phase two maps capacity hour by hour, carries the highlighted sentence about staff at lunch, and is followed by a section recording three observed lunch hours on one unit. Phases three to five cover the change agent's resources and limits, staged objectives and a facilitator role. Phase six plans maintenance through the assignment sheet, citing Kotter, and phase seven hands ownership to the units. The last section lists the questions the model leaves open and hands them to readiness theory.
Where the points sit in the NU803 Unit 1 rubric
Change model applications are commonly assessed on understanding of the model, depth of application, insight, critique and writing. Understanding earns credit when phases are described accurately and attributed. Application rewards each phase tied to specific events or decisions in the setting. Insight is judged on whether the model revealed something that changed the plan. Critique is credited when the closing pages set out what the model does not address and where another framework is needed. Writing covers organization and APA citation. Observations from the setting, such as time spent on the unit, often strengthen the application criterion considerably because they show the model tested against practice.
NU803 Unit 1 help: mistakes that cost points
A frequent weakness is summarizing the model's phases without applying them. Another is applying every phase at equal length, so the most useful finding is buried. Some papers apply a model to an imagined change, which gives nothing to test. Others treat the model as proof that the change will succeed. Many skip the final phases, maintenance and handover, which are where changes most often fail. And critique is often absent. Apply the model to real events, spend the most words on the phase that taught you most, describe maintenance and handover in detail, and say what the model could not explain. Remember too that a model applied to a finished change can still teach, provided you are honest about what you noticed only afterward.
Get an NU803 Unit 1 example written to your instructions
Name the change you are applying the model to, where it stands now and which model your section prefers, then include the Unit 1 prompt and its rubric. The first custom sample costs nothing and takes 24-48h; it reads every phase against real events, including where the model predicted trouble correctly and where it said nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More NU803 papers and DNP samples
- NU803 Unit 2: Readiness Assessment
- NU803 Unit 3: Discussion Board Post
- NU803 Unit 4: Stakeholder Interest Analysis
- NU803 Unit 5: Measurement Plan
- NU803 Unit 6: Baseline Data Summary
- NU803 Unit 7: Run Chart Interpretation
- NU803 Unit 8: Statistical Analysis Write-up
- NU803 Unit 9: Seminar Reflection
- NU803 Unit 10: Sustainability Plan
- NU800 Unit 1: Problem Statement, Steroid Glucose
- NU753 Unit 1: Microsystem Assessment, 5 West
- NU703 Unit 1: Discussion Post, What the DNP Adds
- NU743 Unit 1: Reasoning Narrative, Treat in Place
NU803 Unit 1 questions, answered
Is Lippitt's model still acceptable in a doctoral course?
Usually, if it fits the change and the paper uses it rather than names it. Older models remain common in nursing programs because their phases are concrete. Lippitt suits changes where the change agent's own position matters, as it does when one shift leads work that lands on another. Check whether your section prefers a specific model before committing.
Does the change have to be one I am leading?
Not always. Many prompts accept a change someone else is leading at your workplace, provided you can describe its events accurately. The sample applies the model to the writer's own project because the later units analyze its data, which keeps the course's two halves connected. A change observed from outside works too, with less detail on the change agent.
Where can I find a free NU803 Unit 1 sample paper?
The complete NU803 Unit 1 change model application is on this page, with all seven of Lippitt's phases applied to a real change, an observed lunch hour, staged objectives, maintenance and handover, and the model's limits, plus three references. An application to your own change can be drafted.
What did phase two reveal in NU803 Unit 1?
That pre-lunch checks fall due during the first lunch wave, when each unit runs with fewer staff and break coverage means answering call bells. Motivation was high, but capacity at that hour was the barrier.
Why stage the check targets separately in NU803 Unit 1?
Because pre-dinner checks fall when capacity is higher and could succeed early, while pre-lunch checks depend on changing break times. Separate targets give an early success and keep the harder problem visible.