| Course | NU712 Quality Improvement and Interprofessional Collaboration for the Doctoral Nurse |
|---|---|
| Unit | Unit 9 |
| Paper type | Project charter and measurement plan |
| Length | About 1,140 words, 7 pages double-spaced |
| Format | APA 7 student paper |
| School | Purdue University Global |
| Program | Doctor of Nursing Practice (DNP) |
| Updated | October 2026 |
Free sample paper for NU712 Unit 9
One Aim, Seven Measures, Three Terms: A Unit 9 Project Charter and Measurement Plan for Spreading an Insulin Discharge Bundle
[Student Name]
Purdue University Global
NU712: Quality Improvement and Interprofessional Collaboration for the Doctoral Nurse
Unit 9 Project Charter and Measurement Plan
[Instructor Name]
[Date]
The hospital, units, team and figures are composite and illustrative; the guidance and studies cited are real.
Project Title
Ready at Home: Spreading an Insulin Discharge Readiness Bundle to Ten Adult Inpatient Units.
Problem Statement
In the year before the bundle, 31 of 214 patients who left the two pilot units on new insulin, about 14 percent, were seen again within a month because their glucose ran dangerously high or low. During the bundle's first year on those units, 20 of 212 returned, a little under 10 percent. The other eight adult inpatient units discharge about 400 patients a year on new insulin without the bundle. The equity analysis in Unit 7 showed that the bundle's components reached Medicaid, uninsured, older and rural patients less reliably than others.
Aim Statement
By the end of NU806, the proportion of patients discharged on new insulin from all ten adult inpatient units who return within 30 days with a glucose problem will fall from a baseline of about 14 percent on the eight spread units to 10 percent or lower, while every bundle component is delivered to at least 85 percent of patients in each payer group.
The aim carries its own equity condition, so the project cannot reach its target by helping only insured, younger, nearby patients.
An aim that can be met while the uninsured fall further behind is not the aim this project needs.
Scope
In scope. Adults on the ten inpatient units who start insulin during the stay and go home on it, including patients who restart insulin after more than a year without it.
Out of scope. Patients already on insulin before admission, patients discharged to a skilled nursing facility, who receive their insulin from facility nurses, the pediatric unit and the emergency department.
Team and Roles
The DNP student leads the project and owns the measurement plan. As sponsor, the chief nursing officer has signed off on a go-live calendar that keeps each unit's start at least eight weeks from its sepsis bundle start. The diabetes educator owns teaching content and the text follow-up queue. A clinical pharmacist owns pen access and the prior authorization step added after Unit 7. A hospitalist champion owns order-set changes. Each unit names a nurse champion, who leads a 15-minute bundle review in that unit's monthly council meeting. A data analyst from quality builds the monthly extract, and a patient advisor who started insulin two years ago reviews every patient-facing change.
Decision rules. Changes to bundle content need agreement from the educator and pharmacist and a review by the patient advisor; changes to go-live timing need the sponsor; any safety signal, such as a rise in lows after discharge, pauses the spread on the next unit until the team has reviewed it.
Timeline
NU802. Baseline data for the eight spread units, the measurement build, ethics review by the hospital's quality improvement determination process and go-live on 4 West and 3 West.
NU804. Go-live on four more units, at roughly six-week intervals, with PDSA cycles on each unit's adaptations.
NU806. Go-live on the last two units, six months of follow-up data for the earlier units, the final analysis and a report written to SQUIRE 2.0.
The Family of Measures
Each measure below lists its definition, numerator and denominator, source and frequency.
Outcome 1: 30-day glucose-related return. Numerator: in-scope patients seen in the emergency department or readmitted within 30 days of discharge with hypoglycemia, hyperglycemia or diabetic ketoacidosis coded as a primary or secondary diagnosis. Denominator: in-scope patients discharged that month. Source: the hospital's encounter data, which miss visits to other hospitals; the limitation will be reported. Monthly, by unit and payer.
Process 2: all components delivered. The proportion of in-scope patients who received all five bundle components, counted only when every one is documented. Nolan and Berwick (2006) argue that this kind of all-or-none measure reflects what the patient actually needs and pushes teams to fix the system rather than the easiest component. Monthly, by unit, payer, age group and distance.
Process 3: pen by the first insulin day. Patients whose dispensed pen is recorded by the end of the first calendar day on which insulin was given, divided by in-scope patients. Monthly, by payer.
Process 4: follow-up completed by day three. Patients with a documented text reply, call or visit by the end of the third day after discharge. Monthly, by age group.
Process 5: transition questions answered. The share of patients for whom the day-seven contact records the three confidence and meaning questions added after the Unit 8 theory application. Reported as exploratory.
Balancing 6: time from discharge order to departure. Median minutes for in-scope patients, to check that bundle work does not delay discharge. Monthly.
Balancing 7: nurse time on follow-up. Weekly minutes logged in the follow-up queue per unit, with a review triggered above three hours a week on any unit.
How the Data Will Be Displayed and Judged
Each measure will be shown on a run chart by month, with an annotation for each go-live and each tested change. Once a unit has 20 or more monthly points, the outcome and the all-components measure will move to a p-chart, since proportions with changing monthly denominators need control limits that change with them. Langley et al. (2009) describe the run chart as the improvement team's main way of learning from data over time; this plan treats the run chart as the working tool and the control chart as the confirming one. The final report will set each spread unit's return rate for the half year preceding its start beside the half year that follows, with a confidence interval, and will state honestly that a pre-post comparison cannot rule out other changes in the hospital.
Reporting
Results go to each unit council monthly, to the nursing quality committee quarterly and to the faculty committee at the end of each course. The final paper will be written to SQUIRE 2.0, so that a reader can see the hospital and its units, exactly what changed, how the change was evaluated and how each measure was defined (Ogrinc et al., 2016).
Risks
The chief risks are educator capacity, competing priorities and measure drift, meaning a slow change in how staff document the components. The text follow-up addresses the first, the go-live calendar the second and a quarterly audit of ten charts per unit the third.
Approval
The charter will be signed by the sponsor, the DNP student and the faculty project chair before NU802 week one, and revised only through the decision rules above.
References
Langley, G. J., Moen, R. D., Nolan, K. M., Nolan, T. W., Norman, C. L., & Provost, L. P. (2009). The improvement guide: A practical approach to enhancing organizational performance (2nd ed.). Jossey-Bass.
Nolan, T., & Berwick, D. M. (2006). All-or-none measurement raises the bar on performance. JAMA, 295(10), 1168-1170. https://doi.org/10.1001/jama.295.10.1168
Ogrinc, G., Davies, L., Goodman, D., Batalden, P., Davidoff, F., & Stevens, D. (2016). SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): Revised publication guidelines from a detailed consensus process. BMJ Quality & Safety, 25(12), 986-992. https://doi.org/10.1136/bmjqs-2015-004411
NU712 Unit 9 instructions, in plain terms
The Unit 9 assignment commonly asks for a charter for the student's own DNP quality improvement project, with a measurement plan detailed enough to use. Expect to state the problem with baseline data, write an aim with a target and date, define what is in and out of scope and name the team with each member's role. A timeline across the remaining project courses is usually required. The measurement plan is where most work goes: outcome, process and balancing measures, each with an operational definition, data source and frequency. Prompts often ask how data will be displayed and judged, such as run charts, and how results will be reported. Risks and sign-off complete many versions. Instructors look for a charter a practice site could actually approve and an analyst could actually build.
Inside the NU712 Unit 9 example
The charter opens with a short project title, then a problem statement built from the pilot's before-and-after figures and the units still without the bundle. The aim adds an equity condition, under a highlighted line that an aim met while the uninsured fall behind is the wrong aim. Scope lists who is in and out, including patients discharged to nursing facilities. The team section names the sponsor, educator, pharmacist, hospitalist champion, unit champions, analyst and a patient advisor, with decision rules for content, timing and safety signals. The timeline places baseline work and two go-lives in NU802. Seven measures follow, each with numerator, denominator and source, and Nolan and Berwick justify the all-or-none measure. Display, reporting to SQUIRE 2.0, risks and approval close the plan.
NU712 Unit 9 rubric: what earns full points
Charters are usually graded on precision. The aim earns full credit when it names a measure, a baseline, a target, a population and a date, and an equity condition strengthens it. Scope, roles and decision rules show the project can be managed, and graders often check that a sponsor with real authority is named. The measurement plan typically carries the most points: each measure needs an operational definition clear enough that two people would count it the same way, plus source and frequency. A balanced family of outcome, process and balancing measures is expected, and stratification for equity is increasingly rewarded. Display methods should match the data, with run charts for small monthly samples. A timeline across NU802 to NU806 and correct APA 7 citations of the improvement sources fill out the rubric.
Common NU712 Unit 9 mistakes, and how to avoid them
Weak charters state an aim such as improving discharge teaching, with no number, population or date, and the rest of the plan inherits that vagueness. Another common gap is listing measures by name without definitions, so nobody could tell what counts as a return or a completed component. Some plans stop at outcome measures, so nothing shows whether the change was delivered or whether it caused harm elsewhere. Teams are often listed by title without saying who decides what. Data sources that miss part of the picture, such as visits to other hospitals, should be named as limits rather than ignored. Before drafting, ask your analyst which fields exist and how they are coded, then write each definition around them. A custom charter can be written for the project and site you are bringing into NU802.
Get an NU712 Unit 9 example written to your instructions
Send the project, its aim and the charter instructions with the rubric. A custom charter defines the aim, scope, team, timeline and outcome, process and balancing measures. It comes back within 24-48h, and the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.
More NU712 papers and DNP samples
- NU712 Unit 1: Shared Governance Discussion Post
- NU712 Unit 2: CFIR Implementation Analysis
- NU712 Unit 3: Interprofessional Team Analysis
- NU712 Unit 4: Safety Culture Assessment
- NU712 Unit 5: EBP and QI Seminar Reflection
- NU712 Unit 6: PDSA Cycles Report
- NU712 Unit 7: QI Equity Analysis
- NU712 Unit 8: Transitions Theory Application
- NU712 Unit 10: Sustainability Plan
- NU713 Unit 9: Structural Framework Application, WHO
- NU710 Unit 9: Technology Impact Assessment
- NU733 Unit 9: Advocacy Letter to the Health Officer
- NU708 Unit 9: Conflict and Negotiation Analysis
NU712 Unit 9 questions, answered
What belongs in a QI project charter?
The problem, a specific aim with a target and date, scope, team and roles, timeline, measures and how data will be collected.
What is a family of measures?
A set of outcome, process and balancing measures that together show whether a change is an improvement.
What is a balancing measure?
A measure that checks whether the change causes problems elsewhere, such as longer stays.
Where can I find a free NU712 Unit 9 sample paper?
Read the complete NU712 Unit 9 project charter and measurement plan here, including the dated aim, scope, team, timeline and seven defined measures for spreading an insulin discharge bundle.
Why does the NU712 Unit 9 sample use an all-or-none measure?
Because counting a patient as served only when all five components were delivered reflects what the patient needs and pushes the team to fix the weakest step instead of the easiest one.