MT475 Unit 7 Supplier Quality Scorecard Review Example

Reviewed by Chester Goodwin, MBA Quality Management Purdue University Global Free custom sample in 24 to 48h

Two insulated glass suppliers to a composite skylight plant are compared on quality before price in this MT475 Unit 7 supplier quality review. Over twelve months and 320,000 units, Brennan Glass shows 4,187 incoming rejects per million against Coyle Glass's 17,646, field seal failures of 620 against 2,403 per million, on-time delivery of 96.2 against 91.8 percent and corrective actions closed in 9 days against 34. Pricing rejects at $24 and field failures at $900 turns Coyle's $1.40 price advantage into a 77-cent disadvantage, about $94,000 a year. A lot trace ties the Unit 4 spike to a Coyle lot with a 3.1-millimeter seal against a 4.0 minimum. Volume moves to 80 percent Brennan with conditions for Coyle. Deming's warning about price-tag buying frames Overlook Skylight Company's decision. Purdue Global MT 475 assigns the review in the BS in Business Administration.

CourseMT475 Quality Management
UnitUnit 7
Paper typeSupplier quality review
LengthAbout 840 words, 6 pages double-spaced
FormatAPA 7 student paper
SchoolPurdue University Global
ProgramBS in Business Administration
UpdatedOctober 2026

Free sample paper for MT475 Unit 7

1

The Cheaper Glass Costs More: An MT475 Unit 7 Supplier Quality Review of Two Insulated Glass Suppliers

[Student Name]

Purdue University Global

MT475: Quality Management

Unit 7 Supplier Quality Review

[Instructor Name]

[Date]

Overlook Skylight Company, Brennan Glass, Coyle Glass and every figure are composite; the sources cited are real.

What this part is doingReversing the price ranking in the lead shows why the review puts quality evidence before price.
2

Why the Scorecard Comes First

The scorecard comes before price, and that order is the review's purpose. A buyer who sees price first reads every defect figure as an argument against the cheaper supplier. A buyer who sees the evidence first can judge price in its light. Deming (1986) urged companies to end the practice of awarding business on price tag alone, because the lowest price often carries the highest total cost.

The Scorecard

Overlook Skylight Company bought about 320,000 insulated glass units in the last twelve months, 62 percent from Brennan Glass and 38 percent from Coyle Glass. Four measures cover the year.

Incoming rejects, units failing receiving inspection for chips, scratches or seal defects: 4,187 parts per million for Brennan and 17,646 for Coyle, more than four times as many.

Field seal failures traced to the supplier, units whose seal failed after installation and whose lot code pointed back to the supplier: 620 per million for Brennan and 2,403 for Coyle.

On-time delivery: 96.2 percent for Brennan and 91.8 percent for Coyle.

Corrective action speed, measured from Overlook's written problem report to the supplier's verified fix: 9 days for Brennan and 34 for Coyle.

The Cost of Each Supplier's Quality

Each measure has a cost. A rejected unit costs about $24 to handle, return and replace. A field seal failure costs about $900, because replacing glass in an installed skylight means a service call, an installer's time on a roof, new glass and freight. Late deliveries cost about $0.15 a unit for Brennan and $0.40 for Coyle in expediting and line changes.

Per unit, rejects add about $0.10 for Brennan and $0.42 for Coyle. Field failures add about $0.56 for Brennan and $2.16 for Coyle. Brennan's unit price is $40.60 and Coyle's $39.20. Adding quality and delivery costs, Brennan's total cost is about $41.41 a unit and Coyle's about $42.18.

The supplier that is $1.40 cheaper on the invoice is about 77 cents more expensive once its failures are paid for.

What this part is doingTranslating defect rates into a per-unit cost makes the comparison something a buyer can act on.
3

Across Coyle's 121,600 units, the difference is about $94,000 a year.

The Lot Trace

The review also traced the day 11 spike from Unit 4. All 33 skylights that failed that day carried insulated glass from a single Coyle lot. Overlook's lab cut and measured ten retained units from the lot: the secondary seal, the outer bead that keeps moisture out of the space between the panes, averaged 3.1 millimeters, against Overlook's minimum specification of 4.0. Coyle's certificate for the lot reported the seal as conforming. Overlook's incoming inspection checks for visible damage but does not measure seal thickness, so the thin lot passed receiving and was built into skylights. Montgomery (2020) notes that acceptance sampling can only find defects in the characteristics it actually measures, and seal thickness was not one of them.

The trace confirms a point from the Unit 6 seminar: the failure was partly the supplier's and partly Overlook's, since its appraisal did not test the property that failed.

The Decision

Volume will move from a 62 to 38 split to 80 percent Brennan and 20 percent Coyle at the next contract renewal, keeping a second source so Overlook is not dependent on one supplier. Coyle keeps its 20 percent on three conditions: incoming rejects below 8,000 parts per million for two consecutive quarters, corrective actions closed within 14 days and a measured seal-thickness report with every lot. If Coyle meets them for a year, its share can rise again.

Overlook will also change its own appraisal: receiving will measure seal thickness on a sample of every glass lot from both suppliers, for roughly $9,000 a year in technician hours.

What Each Supplier Hears

The review will be shared with both suppliers, not only with Overlook's purchasing team. Brennan will hear that its quality and responsiveness have earned more volume and that Overlook expects capacity planning for the larger share within sixty days. Coyle will hear the specific numbers behind the reduction, the lot trace and the three conditions for keeping and regaining volume. A supplier that knows exactly why it lost business and how to win it back is more likely to improve than one that simply receives smaller orders.

Limits

Field failure rates depend on lot codes recorded at installation, and some service calls lack them. The $900 field failure cost is an average that varies widely by job. And Brennan's capacity to take more volume has not been confirmed; the decision depends on Brennan agreeing to the larger share without longer lead times. Juran and Godfrey (1999) recommend supplier decisions that rest on joint planning rather than on one-sided scorecards, so the next step is a meeting with each supplier to share this review.

What this part is doingEnding with a meeting to share the review shows the decision is meant to improve suppliers, not only to rank them.
4

References

Deming, W. E. (1986). Out of the crisis. MIT Press.

Juran, J. M., & Godfrey, A. B. (Eds.). (1999). Juran's quality handbook (5th ed.). McGraw-Hill.

Montgomery, D. C. (2020). Introduction to statistical quality control (8th ed.). Wiley.

What the MT475 Unit 7 assignment asks for

The Unit 7 task in MT475 asks for a review of supplier quality that leads to a sourcing decision. Present a scorecard before price, so quality evidence is weighed on its own. Typical measures include incoming rejects, field failures traced to the supplier, on-time delivery and corrective action speed, each over a defined period. Then put a cost on each measure and add it to unit price to find a total cost per unit. Trace any specific quality event to its source where data allow. Make a decision with conditions, often shifting volume while keeping a second source. Consider your own organization's part in any failure, such as inspection that missed the defect. Plan how the review will be shared with suppliers. About five pages with a scorecard, a cost section, a trace and a decision is typical for this assignment.

How the MT 475 Unit 7 example is put together

Overlook's review explains why the scorecard comes first, citing Deming. The scorecard reports twelve months of rejects, field failures, delivery and corrective action speed for both suppliers. A cost section prices each measure and adds it to unit price, under a highlighted line that the cheaper supplier costs more, and multiplies the difference across Coyle's volume. The lot trace connects day 11's failures to one Coyle lot whose seals measured below specification, and notes that Overlook's receiving never measured seals, with Montgomery on sampling only what is measured. The decision shifts volume to 80 percent Brennan, sets three conditions for Coyle and adds seal measurement at receiving. A section plans what each supplier will hear, and the limits, citing Juran and Godfrey, end with a joint planning meeting.

MT475 Unit 7 rubric: what earns full points

Supplier quality reviews earn marks for putting evidence before price and for total-cost thinking. Instructors credit a scorecard with defined measures and periods. Converting defect rates into cost per unit is often the most rewarded step, because it lets quality and price be compared directly. Tracing a specific failure to a supplier lot shows investigation rather than assertion. A decision with conditions, rather than simply dropping a supplier, shows practical judgment about supply risk. Acknowledging the buyer's own inspection gaps shows systems thinking. Planning how results will be shared with suppliers reflects modern supplier development practice. Clear tables for the scorecard and cost comparison help the grader. Quality management sources should support the argument against buying on price alone.

MT475 Unit 7 help: mistakes that cost points

The commonest Unit 7 weakness is comparing suppliers on unit price and mentioning quality as a side note. Another is listing defect rates without converting them to costs, which leaves the comparison abstract. Students often recommend dropping the worse supplier entirely, ignoring the risk of a single source. The buyer's own role in a failure, such as missing inspection, is rarely examined. Field failure costs are frequently underestimated, especially for products installed in hard-to-reach places. Before submitting, add each supplier's quality costs to its price and see whether the ranking changes. Then check whether your own receiving inspection would have caught the failure you traced. If not, your decision should include a change on your side as well as the supplier's.

Get an MT475 Unit 7 example written to your instructions

Include the supplier data your Unit 7 prompt provides, the required measures and the rubric. The composite review sent back defines each measure, scores suppliers on defect data before price, does the cost arithmetic honestly and ends on a conditional decision with thresholds and dates. First custom sample free of charge, returned in 24-48h. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.

More MT475 papers and BS in Business Administration samples

MT475 Unit 7 questions, answered

What measures belong in an MT475 supplier quality review?

Commonly incoming defect rate in parts per million, field or in-process failures traced to the supplier, on-time delivery, and corrective action responsiveness. Some sections add audit results, certification status or a total cost figure. Your prompt usually lists the required measures. Define each before reporting it, so the comparison between suppliers is measured the same way.

Should a supplier review include total cost of ownership?

Often yes, as one input rather than the verdict. Adding defect handling and failure costs to the unit price shows what poor quality really costs, but the arithmetic may still favor the cheaper supplier. When it does, say so, and base the decision on risks the cost figure cannot capture, such as field failures and slow corrective action.

What is corrective action closure time?

The time between reporting a defect to the supplier and the supplier confirming a verified fix, often tracked through a formal corrective action request or an 8D report. Short closure suggests the supplier finds and removes causes; long closure suggests problems are acknowledged but not solved. Averages can hide outliers, so reporting the longest open case helps.

Where can I find a free MT475 Unit 7 sample paper?

This page carries the full MT475 Unit 7 review comparing two glass suppliers on rejects, field failures, delivery and corrective action before price.

How much more does the cheaper supplier cost in the MT475 Unit 7 sample?

About 77 cents a unit once rejects and field seal failures are priced, roughly $94,000 a year across its share of glass.