NU512 Unit 9 change readiness assessment example

Reviewed by Elspeth Marlowe, MSN, RN Leadership, Organizational Theory, and Behavior Purdue University Global Free custom sample in 24 to 48h

This page holds a complete NU512 Unit 9 change readiness assessment example in true form. Before a shared mobility plan launches on a composite rehabilitation unit, Shea and colleagues' ORIC measure is given to nurses, therapists and assistants, and scores split along professional lines, with within-group agreement deciding which averages can be read; a second product maps every approval the plan needs and shows who can stop it outright, however ready staff feel.

What this page holds

Before a shared mobility plan launches, an NU512 Unit 9 readiness assessment scores ORIC commitment and efficacy by profession and maps each approval the plan requires. Searches like "nu 512 unit 9 assignment example", "nu512 unit 9 sample" and "nu512 unit 9 example" land here.

1

Committed but Doubtful, Capable but Unconvinced: A Change Readiness Assessment for a Shared Mobility Plan, With a Map of Who Can Stop It

[Student Name]

Purdue University Global

NU512: Leadership, Organizational Theory, and Behavior

Unit 9 Assignment

[Instructor Name]

[Date]

Survey results are composite and bracketed; no instrument items are reproduced. The readiness theory and measure cited are published.

What this part is doingThe title gives the two groups' opposite patterns in six words. Readiness treated as a group property, not an average, is the assessment's central choice.
2

The Change

A single mobility status for each patient, agreed every afternoon between the therapist who knows the patient best and whoever is in charge of the day shift, displayed at the bedside and in one shared field of the record, with nursing carryover activities built on it. The change replaces separate assist levels in the therapy note and the nursing care plan, the arrangement that produced the recurring night-time dispute analyzed in Unit 5.

The Theory and the Measure

A group is ready for change, in Weiner's theory, when its members share two things: the will to put the change into practice and the belief that, together, they can (Weiner, 2009). Change commitment is the shared resolve to implement; change efficacy is the shared belief in the group's capability, which depends on members' judgments about the task's demands, the resources available and the situation. Because readiness is defined as shared, it makes sense to report it for a group only when members agree.

Shea et al. (2014) developed the Organizational Readiness for Implementing Change measure from that theory: 12 items, five for commitment and seven for efficacy, each rated on a five-point scale. It was given anonymously to all [44] unit staff in [August], with [36] responding.

Results by Group

Subscale means, with within-group agreement beside each, where agreement near 1 means members answered alike and values below about 0.7 suggest the mean should not be read as a shared view (James et al., 1984).

1. Registered and licensed practical nurses, [n = 17]. Commitment [4.1], agreement [0.84]. Efficacy [2.9], agreement [0.79].

2. Therapists, physical, occupational and speech, [n = 11]. Commitment [2.8], agreement [0.52]. Efficacy [3.9], agreement [0.76].

3. Nursing assistants, [n = 8]. Commitment [4.3], agreement [0.88]. Efficacy [4.0], agreement [0.81].

What this part is doingAgreement sits beside every mean because readiness is a shared state. A group average without agreement can describe a group that does not exist.
3

Reading the Patterns

Nurses: committed but doubtful. Nurses want the change, and agree that they want it; they have lived with the night-time dispute. Their low efficacy is best read through Weiner's account of efficacy as a judgment about task demands, resources and situation: nurses doubt that the staffing grid allows a day charge nurse to meet a therapist every afternoon, and doubt that night staff can keep carryover going with one assistant per twelve patients. The nurses' problem is not motivation but a belief, probably accurate, that the unit's resources do not match the task.

Therapists: capable but unconvinced, and divided. Therapists are confident they could do it, and agree about that. Their commitment is low, and their low agreement is itself a finding. Physical therapists answered the commitment items much more positively than occupational therapists, echoing the occupational therapists' objection, earlier in the term, to nurses scoring self-care. A single therapy mean would hide that the change reads differently to two professions that are often grouped together.

Assistants: ready on both. Consistent with their response to carryover, assistants see the change as recognizing their work and believe they can do it.

The Approval Map

Readiness among staff does not decide whether the plan can start. A separate question is who can stop it regardless of how ready staff feel.

Formal approvals, each able to stop the plan:

1. Rehabilitation services director: therapist time for the afternoon status meeting.

2. Director of nursing: charge nurse time and the change to the nursing care plan.

3. Physiatry medical director: a change to how activity orders relate to the shared status.

4. The record's clinical documentation committee: a new shared field in the electronic record.

5. The nursing practice council: revision of the fall precautions policy to reference the shared status.

Informal influencers, who cannot formally stop it but whose opposition would stall it:

6. The senior physical therapist, who holds the therapy grid in practice.

7. The long-serving night charge nurse, the center of nursing's trust network.

The documentation committee is the approval most likely to delay the plan, because record changes are scheduled quarterly.

What this part is doingThe approval map asks a question the survey cannot: who can stop the plan outright. Separating formal approvals from informal influencers shows where time, not willingness, sets the launch date.
4

Why Measure Readiness at All

It would be possible to skip this step and launch. The unit's history argues against that. The 0815 huddle and the first version of carryover both launched without asking how each group saw them, and both produced reactions that surprised their designers. Weiner (2009) argues that implementation is more likely to succeed when readiness is high, because committed and confident members initiate change, persist through setbacks and cooperate with one another. Measuring readiness before launch does not guarantee success, but it shows in advance where the change is likely to stall, and it lets the design respond to that rather than to a surprise in the second month.

Limits of the Assessment

The groups are small, so a few answers move a mean, and agreement statistics are unstable at these sizes. Staff may have answered more positively than they feel, although the survey was anonymous. The measure asks about readiness for a change described in one paragraph; staff may understand the change differently once it is in front of them. And readiness can shift quickly: a staffing crisis in the month before launch could lower nurses' efficacy further. A short repeat survey two weeks before launch would show whether the recommendations below have moved the scores.

What the Assessment Recommends

Before launch, address nurses' efficacy and therapists' commitment separately, since they are different problems. For nurses, protect twenty minutes of day charge nurse time each afternoon and pilot the status meeting on one hall of twelve beds, which answers the resource doubt directly. For therapists, meet occupational therapists separately to agree on what the shared status includes and what remains occupational therapy's assessment, since their low commitment likely reflects the earlier encroachment. Submit the record change to the documentation committee now, because its timeline, not staff readiness, sets the earliest launch date.

Engage the two informal influencers by name. The physical therapist who draws up each day's grid should co-design the afternoon status meeting, since it touches her grid, and the night charge nurse should review how the shared status will appear to night staff, since night nurses will be the first to act on it at 0230. If either sees the change as another group's project, the scores above will not matter. A short note to each, written by the assistant nurse manager and the rehabilitation services director together, would itself signal that the plan belongs to both professions.

5

References

James, L. R., Demaree, R. G., & Wolf, G. (1984). Estimating within-group interrater reliability with and without response bias. Journal of Applied Psychology, 69(1), 85-98. https://doi.org/10.1037/0021-9010.69.1.85

Shea, C. M., Jacobs, S. R., Esserman, D. A., Bruce, K., & Weiner, B. J. (2014). Organizational readiness for implementing change: A psychometric assessment of a new measure. Implementation Science, 9, 7. https://doi.org/10.1186/1748-5908-9-7

Weiner, B. J. (2009). A theory of organizational readiness for change. Implementation Science, 4, 67. https://doi.org/10.1186/1748-5908-4-67

How this NU512 Unit 9 example is structured

Readiness is treated as a group property, which shapes every analytical choice. Scores are averaged only where within-group agreement justifies it, and the therapists' low agreement becomes a finding: physical and occupational therapists answered differently, echoing the objection to nurses scoring self-care earlier in the term. Nurses' pattern, committed but doubtful, is read through Weiner's account of efficacy as a judgment about task demands, resources and situational factors; nurses want the change and do not believe the staffing grid allows it. The approval map then asks a separate question: who can stop the plan regardless of how ready staff feel? Five approvals are formal, from the rehabilitation services director's therapist time to an informatics build of the status field. Two are informal, the senior physical therapist and the night charge nurse. Sequencing recommendations close the paper, matched to each gap.

Get an NU512 Unit 9 example written to your instructions

Readiness only means something for a specific change. Describe yours in a few lines, note which staff groups it touches, and include the Unit 9 instructions and rubric; an example assessment scored by group, paired with an approval map, follows in 24-48h, free the first time. Gathering and interpreting your own staff's answers is still your work. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.

NU512 Unit 9 questions, answered

Do I have to administer the ORIC to real staff?

Most sections do not require live data. Many accept a projected assessment, in which the writer estimates each group's likely readiness and explains the basis. If you do survey colleagues, check whether your facility requires approval, keep responses anonymous, and report only group results. The sample's scores are bracketed composites standing in for what a real administration would produce.

What is within-group agreement, and do I need it?

It is a check on whether members of a group answered similarly enough for their average to mean something. Because ORIC measures readiness as a shared state, a mean built from widely divergent answers can mislead. The sample reports an agreement index beside each mean. If your assignment is projected rather than surveyed, a sentence acknowledging the issue is usually enough.

Can I use a different readiness instrument?

Yes. Some sections use the Organizational Readiness to Change Assessment, Holt's readiness scale or a checklist from the reading. ORIC suits the sample because it is short and separates commitment from efficacy, which is where the groups differed. Whatever you choose, name its developers correctly and explain what its subscales measure before reporting results.