Six indicators replace a pile of departmental counts in this MT400 Unit 5 performance indicator set, which measures a window order from signature to payment the way a homeowner lives it. They grow from a sample of 120 post-install comments: an install date soon after signing, a job finished in one visit and a clean close. Each indicator is defined so tightly that two people working from one quarter's records reach one figure, and carries a baseline, a twelve-month target and an accountable role, from contract to installed at a 58-day median down to a 40-day target. Two balancing measures watch for gaming, four departmental counts are retired with reasons, and a test by two analysts tightened two definitions. Purdue Global MT 400 assigns this set in the BS in Business Administration, after the Unit 4 handoffs.

CourseMT400 Business Process Management
UnitUnit 5
Paper typePerformance indicator set
LengthAbout 900 words, 6 pages double-spaced
FormatAPA 7 student paper
SchoolPurdue University Global
ProgramBS in Business Administration
UpdatedOctober 2026

Free sample paper for MT400 Unit 5

1

Measured as the Homeowner Lives It: An MT400 Unit 5 Performance Indicator Set for Contract to Cash

[Student Name]

Purdue University Global

MT400: Business Process Management

Unit 5 Performance Indicator Set

[Instructor Name]

[Date]

The company, baselines and targets are composite; the sources cited are real.

What this part is doingPromising tight definitions in the lead tells the reader the set is built to be computed, not admired.
2

What Homeowners Value

The set begins with the receiver's outcome, not with whatever data already exists. A sample of 120 post-install comments at Loess Hills Window Company shows homeowners value three things: an install date they can rely on, set soon after signing; one visit that leaves the job complete; and a final bill that is settled promptly without reminders. Each indicator answers one of these values, and a column in the table shows which.

The Six Indicators

Contract to installed measures the median number of calendar days from the signature date on the contract to the date on the signed completion slip, for all jobs completed in the month, with the 90th percentile reported beside it. The baseline is a median of 58 days with the 90th percentile at 104; the targets are 40 and 70. It answers the value of a soon and firm install date. The clock starts at signature, not at deposit, because the homeowner's wait starts when they sign.

Installed right on the first visit measures the share of jobs completed in one visit with no return trip within 30 days, from the scheduling system. The baseline is 78 percent; the target is 90.

Remake rate measures the share of ordered units remade because of a measurement, ordering or installation error, from purchasing's remake log. The baseline is 6.8 percent; the target is 3.5.

Installed to paid measures the median days from the completion slip to the cleared final payment, from the payment record. The baseline is 11 days; the target is 3. It answers the value of a clean close.

Status calls per job measures inbound calls asking where an order stands, divided by jobs in progress, from the phone system's call codes. The baseline is 1.9 per job; the target is 0.5. Each such call is a sign that the homeowner did not know what was happening.

Post-install rating measures the average score on the one-question survey sent the day after installation, on a five-point scale. The baseline is 4.1; the target is 4.5.

Leading and Lagging

Remake rate is filed as a leading signal and the rating as a lagging one. A remake is known weeks before the homeowner rates the job, because the remake order is placed as soon as the wrong unit arrives. Watching remakes therefore warns of first-visit trouble well before any homeowner scores it. Kaplan and Norton (1992) argued that a useful measurement system pairs outcome measures with the drivers that predict them, and this pairing does that at the scale of one process.

A measure that two analysts would compute differently is an argument waiting to happen, not a measure.

What this part is doingStating the definitional standard as a principle explains why every indicator specifies its start and end points.
3

Balancing Measures

Every indicator invites a shortcut, so two balancing measures watch the likeliest ones. Crew overtime per install watches whether contract to installed is being shortened by working crews longer days rather than by removing waiting. Order-line corrections after release watches whether orders are being released faster by skipping verification, which would show up as more remakes later. Kerr (1975) showed how reward systems end up paying for the opposite of what managers want, and the balancing measures exist to catch that drift early.

Indicators Retired

Four departmental counts will no longer be reported. Measures completed per technician per day is retired because it rewards rushing measurements, the main source of remakes. Orders entered per day is retired because it ignores how long orders waited before entry. Crew utilization is retired as a headline figure because it rewards holding installs until a full day's route is booked, which lengthens the homeowner's wait. Invoices issued per week is retired because it says nothing about how long completed jobs waited to be invoiced. Parmenter (2015) recommends keeping the number of headline indicators small, and retiring counts that conflict with the process measures keeps the set focused.

How the Set Was Tested

Before adoption, two analysts computed all six indicators independently from the same quarter's records. They matched on four. They differed on contract to installed, because one counted from the deposit date and the other from the signature date, and on installed right on the first visit, because one counted a service call for an unrelated issue as a return visit. Both definitions were tightened: the clock starts at the contract's signature date, and only return visits that complete the original scope count against first-visit success. A second independent computation then matched on all six.

What the Baselines Show Together

Read together, the baselines describe one problem from several angles. A 58-day median install, 1.9 status calls per job and a 4.1 rating are what homeowners experience when orders wait between departments; a 6.8 percent remake rate and 78 percent first-visit success are what happens when information is lost at those same handoffs. The targets assume the redesign in Unit 7 will remove most of the internal waiting.

Review and Accountability

The six indicators are reviewed monthly by the process owner named in the Unit 9 charter, and each is assigned an accountable role for its data. Targets are reviewed after twelve months.

What this part is doingAssigning review and data roles shows the indicators will be maintained, not just defined once.
4

References

Kaplan, R. S., & Norton, D. P. (1992). The balanced scorecard: Measures that drive performance. Harvard Business Review, 70(1), 71-79.

Kerr, S. (1975). On the folly of rewarding A, while hoping for B. Academy of Management Journal, 18(4), 769-783. https://doi.org/10.2307/255378

Parmenter, D. (2015). Key performance indicators: Developing, implementing, and using winning KPIs (3rd ed.). Wiley.

MT400 Unit 5 instructions, in plain terms

In Unit 5 students define a small set of measures for the process they analyzed. Instructors expect the indicators to start from what the process's customer values rather than from data that happens to be available. Each one needs an exact definition, with start point, end point, population and data source, so it cannot be computed two ways. Baselines and targets should be stated, with a reason for each target. Many prompts ask for a mix of leading and lagging measures and for balancing measures that reveal gains bought at a hidden cost. Retiring departmental counts that conflict with the process view is often rewarded. The set should be small enough for one review meeting, typically five to eight measures, and each should name the role responsible for its data.

How this MT400 Unit 5 example is built

This example begins with homeowner comments and the three things they value, then lists six indicators, each tagged to one of those values. Contract to installed, first-visit success, remake rate, installed to paid, status calls per job and the post-install rating each get a definition, a source, a baseline and a target. A short section files the remake rate as a leading signal for the rating, citing Kaplan and Norton. A highlighted line holds that a measure two analysts compute differently is an argument in waiting. Crew overtime and order-line corrections serve as balancing measures, with Kerr on rewards that backfire. Four counts, from measures per technician to invoices per week, are retired. A test by two analysts and the review cadence close the set.

Reading the MT400 Unit 5 grading rubric

Indicator sets are generally graded on alignment with customer value, precision of definitions, credible baselines and targets, and protection against gaming. A measure with no stated start and end point loses points because it cannot be checked. Rubrics usually reward a clear link from each indicator back to what the customer receives. Balancing measures earn credit when each is paired with the shortcut it guards against. Retiring conflicting departmental counts shows the student understands how measures shape behavior. Testing the definitions, even on a small sample, demonstrates rigor. Points also go to a set small enough to use, named owners for data and review, and APA 7 citations. Graders often mark down targets that halve a figure with no reason drawn from the analysis.

Common MT400 Unit 5 mistakes, and how to avoid them

The most common weak set lists every number the company already collects, which measures departments rather than the process. Many drafts define cycle time without saying when the clock starts, which is how two analysts end up a week apart. Targets are often chosen as round numbers with no basis. Balancing measures are frequently missing, so a faster process could be achieved by rushing work and nobody would notice. Students rarely retire anything, leaving old counts in place that reward the very behavior the process measures discourage. Before submitting, give your definitions to a classmate with a small dataset and see whether you get the same answers. Where you differ, the wording needs another pass, and saying how you fixed it strengthens the paper.

Get an MT400 Unit 5 example written to your instructions

Your process, your baselines, your rubric: those three inputs shape a first custom MT400 indicator set, and it costs nothing. Within 24-48h it returns definitions, sources, baselines and targets laid out for the Unit 5 criteria. Where a case supplies no baselines, estimates are labeled as estimates rather than presented as data. The paper above is an original model document written by our desk, not a submitted student paper and not an official Purdue University Global document.

More MT400 papers and BS in Business Administration samples

MT400 Unit 5 questions, answered

How many indicators should an MT400 Unit 5 set include?

Enough to cover what the process's customer values, and few enough that a process owner can review them in one meeting. Five to eight is typical. The sample uses six plus two balancing measures. If your prompt names a number, follow it; if not, justify each measure by the outcome it tracks rather than adding figures because data exists.

What is a balancing measure?

A second indicator watched alongside a primary one to catch improvement achieved at a hidden cost. If cycle time is the target, overtime or error rates reveal whether speed came from exhausting staff or cutting corners. Including one or two shows a grader that you understand how measurement changes behavior inside the process.

Should targets be realistic or ambitious?

Both, anchored to evidence. State the baseline, then set a target you can defend from the redesign ideas or benchmarks your case supplies. A target halving a cycle time with no reason given looks arbitrary. The sample ties each target to a twelve-month horizon and to the handoff delays found earlier in the term.

Where can I find a free MT400 Unit 5 sample paper?

The complete MT400 Unit 5 indicator set is here, defining six homeowner-centered measures for a window order with baselines, targets and two balancing measures.

Which definitions did the MT400 Unit 5 sample have to tighten?

Contract to installed, because one analyst started the clock at deposit and the other at signature, and first-visit success, over what counts as a return visit.